Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
197
matching recommendationsSIC | 363 | Household Appliances |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1026 # 02 Y:2021 | 02 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $174,302 | $45,000 | Implemented |
UD1026 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,601 | $0 | Implemented |
UD1026 # 05 Y:2021 | 05 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $42,343 | $88,894 | Implemented |
TT0233 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $43,091 | $147,540 | Implemented |
TT0233 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,658 | $2,000 | Implemented |
TT0233 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $52,049 | $2,000 | Implemented |
TT0233 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,084 | $30,000 | Implemented |
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |
MZ0198 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,611 | $1,500 | Implemented |
MZ0198 # 04 Y:2015 | 04 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $17,298 | $1,040 | Implemented |
WM0045 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $2,701 | $0 | Implemented |
WM0045 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $478 | $280 | Implemented |
WM0045 # 09 Y:2014 | 09 | 2014 | COVER OPEN TANKS | $51 | $0 | Implemented |
WM0045 # 11 Y:2014 | 11 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,255 | $1,220 | Implemented |
NC0449 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $883 | $1,560 | Implemented |
NC0449 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,300 | $10,168 | Implemented |
TT0071 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,700 | $5 | Implemented |
TT0071 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,100 | $66,100 | Implemented |
TT0071 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,400 | $52,100 | Implemented |
TT0034 # 07 Y:2009 | 07 | 2009 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $4,000 | $0 | Implemented |
TT0034 # 08 Y:2009 | 08 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,400 | $0 | Implemented |
TT0034 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,900 | $800 | Implemented |
IC0138 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $927 | $3,982 | Implemented |
IC0138 # 06 Y:2008 | 06 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,154 | $0 | Implemented |
IC0138 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,232 | $143,228 | Implemented |