IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

403

matching recommendations
Reset
SIC 363 Household Appliances
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1026 # 02 Y:2021 02 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $174,302 $45,000 Implemented
UD1026 # 04 Y:2021 04 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $441,982 $200,000 Not Implemented
TT0233 # 02 Y:2020 02 2020 METER WASTE WATER $52,049 $2,000 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented
TT0233 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $565 $1,450 Not Implemented
TT0233 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,084 $30,000 Implemented
MZ0198 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $1,728 $1,750 Not Implemented
MZ0198 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $4,180 $17,000 Not Implemented
MZ0198 # 04 Y:2015 04 2015 CONDENSE OPERATION INTO ONE BUILDING $17,298 $1,040 Implemented
MZ0198 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,611 $1,500 Implemented
MZ0198 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $915 $250 Not Implemented
MZ0198 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,716 $0 Not Implemented
MZ0198 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $10,113 $2,500 Not Implemented
WM0045 # 01 Y:2014 01 2014 RECYCLE WHITE WATER $6,827 $13,958 Not Implemented
WM0045 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $478 $280 Implemented
WM0045 # 06 Y:2014 06 2014 IMPROVE SPACE COMFORT CONDITIONING $4,160 $350 Not Implemented
WM0045 # 10 Y:2014 10 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $100 Not Implemented
WM0045 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $1,220 Implemented
WM0045 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $313 $630 Not Implemented
WM0045 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,111 $2,030 Not Implemented
WM0045 # 05 Y:2014 05 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,440 $940 Not Implemented
WM0045 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $2,701 $0 Implemented