IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

409

matching recommendations
Reset
SIC 363 Household Appliances
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0297 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $11,161 $14,500 Implemented
TT0297 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,703 $203,650 Not Implemented
UD1026 # 02 Y:2021 02 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $174,302 $45,000 Implemented
UD1026 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $58,812 $45,000 Not Implemented
UD1026 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,601 $0 Implemented
UD1026 # 06 Y:2021 06 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $817 $0 Not Implemented
UD1026 # 05 Y:2021 05 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $42,343 $88,894 Implemented
UD1026 # 04 Y:2021 04 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $441,982 $200,000 Not Implemented
TT0233 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,658 $2,000 Implemented
TT0233 # 02 Y:2020 02 2020 METER WASTE WATER $52,049 $2,000 Implemented
TT0233 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,084 $30,000 Implemented
TT0233 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,859 $20 Implemented
TT0233 # 07 Y:2020 07 2020 INSULATE BARE EQUIPMENT $565 $1,450 Not Implemented
TT0233 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $43,091 $147,540 Implemented
TT0233 # 05 Y:2020 05 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,206 $22,392 Not Implemented
MZ0198 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $4,180 $17,000 Not Implemented
MZ0198 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,611 $1,500 Implemented
MZ0198 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $10,113 $2,500 Not Implemented
MZ0198 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,716 $0 Not Implemented
MZ0198 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $915 $250 Not Implemented
MZ0198 # 04 Y:2015 04 2015 CONDENSE OPERATION INTO ONE BUILDING $17,298 $1,040 Implemented
MZ0198 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $1,728 $1,750 Not Implemented
WM0045 # 06 Y:2014 06 2014 IMPROVE SPACE COMFORT CONDITIONING $4,160 $350 Not Implemented
WM0045 # 09 Y:2014 09 2014 COVER OPEN TANKS $51 $0 Implemented
WM0045 # 08 Y:2014 08 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $313 $630 Not Implemented