Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
403
matching recommendationsSIC | 363 | Household Appliances |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1026 # 02 Y:2021 | 02 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $174,302 | $45,000 | Implemented |
UD1026 # 04 Y:2021 | 04 | 2021 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $441,982 | $200,000 | Not Implemented |
TT0233 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $52,049 | $2,000 | Implemented |
TT0233 # 05 Y:2020 | 05 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,206 | $22,392 | Not Implemented |
TT0233 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $43,091 | $147,540 | Implemented |
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |
TT0233 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,658 | $2,000 | Implemented |
TT0233 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $565 | $1,450 | Not Implemented |
TT0233 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,084 | $30,000 | Implemented |
MZ0198 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $1,728 | $1,750 | Not Implemented |
MZ0198 # 06 Y:2015 | 06 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $4,180 | $17,000 | Not Implemented |
MZ0198 # 04 Y:2015 | 04 | 2015 | CONDENSE OPERATION INTO ONE BUILDING | $17,298 | $1,040 | Implemented |
MZ0198 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,611 | $1,500 | Implemented |
MZ0198 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $915 | $250 | Not Implemented |
MZ0198 # 01 Y:2015 | 01 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,716 | $0 | Not Implemented |
MZ0198 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $10,113 | $2,500 | Not Implemented |
WM0045 # 01 Y:2014 | 01 | 2014 | RECYCLE WHITE WATER | $6,827 | $13,958 | Not Implemented |
WM0045 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $478 | $280 | Implemented |
WM0045 # 06 Y:2014 | 06 | 2014 | IMPROVE SPACE COMFORT CONDITIONING | $4,160 | $350 | Not Implemented |
WM0045 # 10 Y:2014 | 10 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $38 | $100 | Not Implemented |
WM0045 # 11 Y:2014 | 11 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,255 | $1,220 | Implemented |
WM0045 # 08 Y:2014 | 08 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $313 | $630 | Not Implemented |
WM0045 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,111 | $2,030 | Not Implemented |
WM0045 # 05 Y:2014 | 05 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,440 | $940 | Not Implemented |
WM0045 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $2,701 | $0 | Implemented |