IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 3633 Household Laundry Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1026 # 06 Y:2021 06 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $817 $0 Not Implemented
UD1026 # 05 Y:2021 05 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $42,343 $88,894 Implemented
UD1026 # 04 Y:2021 04 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $441,982 $200,000 Not Implemented
UD1026 # 03 Y:2021 03 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $58,812 $45,000 Not Implemented
UD1026 # 02 Y:2021 02 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $174,302 $45,000 Implemented
UD1026 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,601 $0 Implemented
IC0138 # 08 Y:2008 08 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $158 $0 Implemented
IC0138 # 09 Y:2008 09 2008 REPAIR OR REPLACE STEAM TRAPS $14,928 $1,500 Implemented
IC0138 # 07 Y:2008 07 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,513 $0 Implemented
IC0138 # 06 Y:2008 06 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,154 $0 Implemented
IC0138 # 05 Y:2008 05 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,556 $20,784 Implemented
IC0138 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,232 $143,228 Implemented
IC0138 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $927 $3,982 Implemented
IC0138 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $422 $537 Implemented
IC0138 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,199 $66,929 Implemented
IA0214 # 07 Y:1999 07 1999 ELIMINATE/REDUCE AN OPERATION $97,749 $800 Implemented
IA0214 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $176,000 $575,000 Not Implemented
IA0214 # 05 Y:1999 05 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $14,369 $4,297 Not Implemented
IA0214 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $764 Implemented
IA0214 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $708 $1,264 Not Implemented
IA0214 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,935 $579 Not Implemented
IA0214 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,846 $13,626 Implemented
OK0524 # 02 Y:1997 02 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $37,293 $65,478 Not Implemented
OK0524 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $450 Not Implemented
OK0524 # 08 Y:1997 08 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $741 $0 Not Implemented