Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,242
matching recommendationsSIC | 364 | Electric Lighting And Wiring Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0668 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,755 | $200 | Not Implemented |
MA0668 # 06 Y:2011 | 06 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,802 | $7,000 | Not Implemented |
MA0668 # 07 Y:2011 | 07 | 2011 | INSULATE BARE EQUIPMENT | $986 | $950 | Implemented |
TT0050 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,500 | $2,900 | Not Implemented |
TT0050 # 02 Y:2010 | 02 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $40,479 | $4,300 | Implemented |
TT0050 # 03 Y:2010 | 03 | 2010 | USE OPTIMUM THICKNESS INSULATION | $6,800 | $1,000 | Not Implemented |
TT0050 # 04 Y:2010 | 04 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,900 | $500 | Implemented |
TT0050 # 05 Y:2010 | 05 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,200 | $0 | Implemented |
TT0050 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $500 | $400 | Not Implemented |
LE0292 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,667 | $27,000 | Implemented |
LE0292 # 02 Y:2009 | 02 | 2009 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $11,701 | $2,700 | Not Implemented |
LE0292 # 03 Y:2009 | 03 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $5,415 | $180 | Implemented |
LE0292 # 04 Y:2009 | 04 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,921 | $3,000 | Implemented |
LE0292 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,424 | $1,840 | Not Implemented |
LE0292 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,459 | $200 | Implemented |
LE0292 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,073 | $3,000 | Implemented |
LE0292 # 08 Y:2009 | 08 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,952 | $1,000 | Not Implemented |
LE0292 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $961 | $420 | Implemented |
MA0651 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $18,774 | $1,000 | Not Implemented |
MA0651 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,340 | $96,800 | Implemented |
MA0651 # 03 Y:2009 | 03 | 2009 | REPLACE BOILER | $10,080 | $30,700 | Implemented |
MA0651 # 04 Y:2009 | 04 | 2009 | COVER OPEN TANKS | $10,013 | $5,866 | Not Implemented |
MA0651 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,941 | $3,219 | Not Implemented |
MA0651 # 06 Y:2009 | 06 | 2009 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,725 | $18,300 | Not Implemented |
SF0370 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $316 | $0 | Not Implemented |