IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,242

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0462 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,916 $8,000 Not Implemented
WI0462 # 04 Y:2004 04 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,136 $1,800 Not Implemented
WI0462 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,319 $500 Not Implemented
WI0462 # 06 Y:2004 06 2004 UPGRADE CONTROLS ON COMPRESSORS $808 $2,500 Not Implemented
WI0462 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $840 Not Implemented
WI0462 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $438 Not Implemented
AM0451 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $13,040 $12,960 Not Implemented
AM0451 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,160 $500 Implemented
AM0451 # 03 Y:2004 03 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,300 $15,770 n/a
AM0451 # 04 Y:2004 04 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,830 $0 Implemented
AM0451 # 05 Y:2004 05 2004 REUSE RAGS UNTIL COMPLETELY SOILED $1,790 $1,910 Implemented
AM0451 # 06 Y:2004 06 2004 COVER OPEN TANKS $940 $500 Not Implemented
AM0451 # 07 Y:2004 07 2004 COVER OPEN TANKS $805 $500 Not Implemented
AM0451 # 08 Y:2004 08 2004 PAY BILLS ON TIME TO AVOID LATE FEES $200 $0 Implemented
WI0457 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,805 $11,000 Not Implemented
WI0457 # 02 Y:2003 02 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,965 $800 Not Implemented
WI0457 # 03 Y:2003 03 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $3,333 $8,000 Not Implemented
WI0457 # 04 Y:2003 04 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,413 $0 Not Implemented
WI0457 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $936 $200 Not Implemented
WI0457 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $740 Not Implemented
AM0447 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $17,500 $22,850 n/a
AM0447 # 02 Y:2003 02 2003 AIR CONDITION ONLY SPACE NECESSARY $9,640 $190 Implemented
AM0447 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,150 $200 Implemented
AM0447 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $830 Implemented
AM0447 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $320 $100 Not Implemented