IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 364 Electric Lighting And Wiring Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0515 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,280 Implemented
WI0515 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $0 Implemented
WI0515 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,857 $3,600 Not Implemented
WI0515 # 02 Y:2006 02 2006 $10,200 $0 Implemented
WI0515 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,672 $64,000 Not Implemented
WI0515 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $0 Not Implemented
WI0515 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Not Implemented
WI0462 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $438 Not Implemented
WI0462 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $840 Not Implemented
WI0462 # 06 Y:2004 06 2004 UPGRADE CONTROLS ON COMPRESSORS $808 $2,500 Not Implemented
WI0462 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,319 $500 Not Implemented
WI0462 # 04 Y:2004 04 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,136 $1,800 Not Implemented
WI0462 # 03 Y:2004 03 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,916 $8,000 Not Implemented
WI0462 # 02 Y:2004 02 2004 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,389 $14,000 Not Implemented
WI0462 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $30,420 $36,000 Not Implemented
WI0457 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,805 $11,000 Not Implemented
WI0457 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $740 Not Implemented
WI0457 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $936 $200 Not Implemented
WI0457 # 04 Y:2003 04 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,413 $0 Not Implemented
WI0457 # 03 Y:2003 03 2003 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $3,333 $8,000 Not Implemented
WI0457 # 02 Y:2003 02 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,965 $800 Not Implemented
WI0425 # 01 Y:2002 01 2002 $58,500 $120,000 n/a
WI0425 # 02 Y:2002 02 2002 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $11,400 $2,000 n/a
WI0425 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,750 $4,800 n/a
WI0425 # 04 Y:2002 04 2002 COVER OPEN TANKS $4,508 $1,512 n/a