IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
SIC 3641 Electric Lamps
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0577 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $168 $799 Not Implemented
NC0577 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,896 $100 Not Implemented
NC0577 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,088 $3,600 Not Implemented
NC0577 # 08 Y:2016 08 2016 REPAIR AND ELIMINATE STEAM LEAKS $106 $200 Not Implemented
NC0577 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,793 $2,000 Not Implemented
NC0577 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $100 Not Implemented
NC0577 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,300 $135,630 Not Implemented
NC0577 # 09 Y:2016 09 2016 TREAT AND REUSE RINSE WATERS $5,659 $7,720 Not Implemented
NC0577 # 02 Y:2016 02 2016 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $11,227 $15,000 Not Implemented
TT0050 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $500 $400 Not Implemented
TT0050 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,900 $500 Implemented
TT0050 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $0 Implemented
TT0050 # 03 Y:2010 03 2010 USE OPTIMUM THICKNESS INSULATION $6,800 $1,000 Not Implemented
TT0050 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,500 $2,900 Not Implemented
TT0050 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,479 $4,300 Implemented
TA0026 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $980 $400 Implemented
TA0026 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $875 $346 Implemented
TA0026 # 06 Y:2002 06 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $500 $0 Implemented
TA0026 # 07 Y:2002 07 2002 LOWER CEILING TO REDUCE CONDITIONED SPACE $214 $0 Implemented
TA0026 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,400 $1,120 Implemented
TA0026 # 02 Y:2002 02 2002 INSTALL STORM WINDOWS AND DOORS $1,690 $230 Implemented
TA0026 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,230 $0 Not Implemented
OK0571 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $7,735 $1,689 Implemented
OK0571 # 04 Y:1999 04 1999 INSTALL SET-BACK TIMERS $372 $387 Not Implemented
OK0571 # 05 Y:1999 05 1999 PAY BILLS ON TIME TO AVOID LATE FEES $782 $0 Implemented