IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
SIC 3643 Current-carrying Wiring Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0168 # 10 Y:1995 10 1995 CLOSE OFF UNNEEDED STEAM LINES $12,433 $0 Not Implemented
ME0168 # 11 Y:1995 11 1995 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $4,998 $3,500 Not Implemented
ME0168 # 12 Y:1995 12 1995 MINIMIZE WATER USAGE $4,333 $1,300 Implemented
ME0168 # 13 Y:1995 13 1995 MINIMIZE WATER USAGE $1,618 $440 Implemented
MA0319 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,463 $10,240 Not Implemented
MA0319 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $5,357 $12,000 Implemented
MA0319 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,412 $10,920 Not Implemented
MA0319 # 04 Y:1994 04 1994 USE SYNTHETIC LUBRICANT $2,218 $555 Not Implemented
MA0319 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $919 $3,119 Not Implemented
MA0319 # 06 Y:1994 06 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,125 $2,197 Not Implemented
NC0017 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,058 $3,076 Implemented
NC0017 # 02 Y:1994 02 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,343 $0 Implemented
NC0017 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,354 $10,150 Not Implemented
NC0017 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $9,405 $3,536 Not Implemented
NC0017 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $1,230 Implemented
NC0017 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,366 $750 Implemented
NC0017 # 07 Y:1994 07 1994 USE RADIANT HEATER FOR SPOT HEATING $12,784 $14,500 Implemented
WI0154 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,712 $160,000 n/a
WI0154 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $6,762 $1,000 n/a
WI0154 # 03 Y:1992 03 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,277 $0 n/a
WI0154 # 04 Y:1992 04 1992 AIR CONDITION ONLY SPACE NECESSARY $5,948 $0 n/a
WI0154 # 05 Y:1992 05 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,359 $7,700 n/a
WI0154 # 06 Y:1992 06 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,257 $10,000 n/a
WI0154 # 07 Y:1992 07 1992 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,040 $1,000 n/a
WI0154 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $356 $1,280 n/a