IAC logo
IAC Assessment: WI0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1992
Principal Product ELECTRICAL PRODUCTS
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 2,000,000 Pieces
Production Hrs. Annual 2,125
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $195,523 2,699,883 kWh $0.07
Natural Gas $13,603 3,885 MMBtu $3.50
TOTAL ENERGY COSTS $209,126
RECOMMENDED SAVINGS* $65,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$33,712
Cost:
$160,000
$38,597 327,374 $(-4,885) (-1,396) - - $38,597
327,374
kWh
$(-4,885)
(-1,396)
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$6,762
Cost:
$1,000
- - $6,762 1,932 - - -
-
kWh
$6,762
1,932
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,277
Cost:
-
$5,277 72,978 - - - - $5,277
72,978
kWh
-
-
MMBtu
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$5,948
Cost:
-
$5,948 82,063 - - - - $5,948
82,063
kWh
-
-
MMBtu
-
-
$
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$4,359
Cost:
$7,700
$4,359 60,082 - - - - $4,359
60,082
kWh
-
-
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$4,257
Cost:
$10,000
$4,257 - - - - - $4,257
-
kWh
-
-
MMBtu
-
-
$
07: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$4,040
Cost:
$1,000
$4,040 55,686 - - - - $4,040
55,686
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$356
Cost:
$1,280
$356 4,982 - - - - $356
4,982
kWh
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$799
Cost:
$8,758
$1,021 14,068 - - $(-222) - $1,021
14,068
kWh
-
-
MMBtu
$(-222)
-
$
TOTAL RECOMMENDED Savings:
$65,510
Cost:
$189,738
$63,855 617,233 $1,877 536 $(-222) - $63,855
617,233
kWh
$1,877
536
MMBtu
$(-222)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes