IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
Reset
SIC 3643 Current-carrying Wiring Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0668 # 02 Y:2011 02 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,899 $11,500 Implemented
MA0668 # 03 Y:2011 03 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,401 $11,610 Implemented
MA0668 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $3,004 $3,750 Implemented
MA0668 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,755 $200 Not Implemented
MA0668 # 06 Y:2011 06 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,802 $7,000 Not Implemented
MA0668 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $986 $950 Implemented
SF0370 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $316 $0 Not Implemented
SF0370 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,936 $2,464 Not Implemented
SF0370 # 03 Y:2009 03 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $684 $849 Not Implemented
SF0370 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $942 $2,473 Not Implemented
SF0370 # 05 Y:2009 05 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $972 $2,956 Not Implemented
SF0370 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,614 $7,537 Not Implemented
SF0370 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $1,231 $10,326 Not Implemented
SF0370 # 08 Y:2009 08 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $74,612 $654,810 Not Implemented
MZ0026 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,366 $900 Not Implemented
MZ0026 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $427 $178 Not Implemented
MZ0026 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,275 $20,400 Not Implemented
MZ0026 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,898 $1,360 Not Implemented
MZ0025 # 01 Y:2008 01 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $62 $200 Implemented
MZ0025 # 02 Y:2008 02 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $222 $1,400 Not Implemented
MZ0025 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $34 $300 Implemented
MZ0025 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,936 $1,400 Implemented
MZ0025 # 05 Y:2008 05 2008 HEAT WATER WITH EXHAUST HEAT $4,352 $10,000 Not Implemented
WV0376 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,171 $21,771 Implemented
WV0376 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,887 $23,022 Implemented