IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3643 Current-carrying Wiring Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0638 # 01 Y:2002 01 2002 $75,000 $10,000 Implemented
UD0638 # 12 Y:2002 12 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128 $101 Implemented
UD0638 # 11 Y:2002 11 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,211 $250 Implemented
UD0638 # 10 Y:2002 10 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,751 $0 Implemented
UD0638 # 09 Y:2002 09 2002 OPTIMIZE PLANT POWER FACTOR $1,935 $1,800 Not Implemented
UD0638 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,144 $6,458 Implemented
UD0638 # 07 Y:2002 07 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,787 $0 Not Implemented
UD0638 # 06 Y:2002 06 2002 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,079 $18,900 Not Implemented
UD0638 # 05 Y:2002 05 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,572 $21,682 Not Implemented
UD0638 # 04 Y:2002 04 2002 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $18,300 $4,175 Not Implemented
UD0638 # 03 Y:2002 03 2002 MAKE A NEW BY-PRODUCT $49,743 $30,000 Implemented
UD0638 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75,000 $17,017 Implemented
UD0223 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $809 $100 Implemented
UD0223 # 02 Y:1987 02 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,302 $131 Implemented
UD0223 # 01 Y:1987 01 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,084 $0 Implemented
UD0221 # 06 Y:1987 06 1987 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,822 $2,070 Implemented
UD0221 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $7,926 $9,000 Implemented
UD0221 # 04 Y:1987 04 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,322 $10,000 Implemented
UD0221 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,218 $0 Implemented
UD0221 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $16,515 $0 Implemented
UD0221 # 01 Y:1987 01 1987 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $3,915 $20,000 Not Implemented
UD0099 # 01 Y:1983 01 1983 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,571 $10,000 Not Implemented
UD0099 # 03 Y:1983 03 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $633 $0 Not Implemented
UD0099 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $9,454 $4,000 Not Implemented