Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3643 | Current-carrying Wiring Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0638 # 01 Y:2002 | 01 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $75,000 | $10,000 | Implemented |
UD0638 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $128 | $101 | Implemented |
UD0638 # 11 Y:2002 | 11 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,211 | $250 | Implemented |
UD0638 # 10 Y:2002 | 10 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,751 | $0 | Implemented |
UD0638 # 09 Y:2002 | 09 | 2002 | OPTIMIZE PLANT POWER FACTOR | $1,935 | $1,800 | Not Implemented |
UD0638 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,144 | $6,458 | Implemented |
UD0638 # 07 Y:2002 | 07 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,787 | $0 | Not Implemented |
UD0638 # 06 Y:2002 | 06 | 2002 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,079 | $18,900 | Not Implemented |
UD0638 # 05 Y:2002 | 05 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $9,572 | $21,682 | Not Implemented |
UD0638 # 04 Y:2002 | 04 | 2002 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $18,300 | $4,175 | Not Implemented |
UD0638 # 03 Y:2002 | 03 | 2002 | MAKE A NEW BY-PRODUCT | $49,743 | $30,000 | Implemented |
UD0638 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75,000 | $17,017 | Implemented |
UD0223 # 03 Y:1987 | 03 | 1987 | INSTALL SET-BACK TIMERS | $809 | $100 | Implemented |
UD0223 # 02 Y:1987 | 02 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,302 | $131 | Implemented |
UD0223 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,084 | $0 | Implemented |
UD0221 # 06 Y:1987 | 06 | 1987 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,822 | $2,070 | Implemented |
UD0221 # 05 Y:1987 | 05 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $7,926 | $9,000 | Implemented |
UD0221 # 04 Y:1987 | 04 | 1987 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $7,322 | $10,000 | Implemented |
UD0221 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,218 | $0 | Implemented |
UD0221 # 02 Y:1987 | 02 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $16,515 | $0 | Implemented |
UD0221 # 01 Y:1987 | 01 | 1987 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $3,915 | $20,000 | Not Implemented |
UD0099 # 01 Y:1983 | 01 | 1983 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,571 | $10,000 | Not Implemented |
UD0099 # 03 Y:1983 | 03 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $633 | $0 | Not Implemented |
UD0099 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $9,454 | $4,000 | Not Implemented |