Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 3643 | Current-carrying Wiring Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0447 # 02 Y:2003 | 02 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $9,640 | $190 | Implemented |
AM0447 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,150 | $200 | Implemented |
AM0447 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $530 | $830 | Implemented |
AM0447 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $320 | $100 | Not Implemented |
AM0447 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,655 | $560 | Implemented |
AM0447 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $17,500 | $22,850 | n/a |
LM0055 # 05 Y:2003 | 05 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,902 | $5,187 | Not Implemented |
LM0055 # 08 Y:2003 | 08 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $277,680 | $6,344 | Not Implemented |
LM0055 # 07 Y:2003 | 07 | 2003 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $215,000 | $20,000 | Implemented |
LM0055 # 06 Y:2003 | 06 | 2003 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $3,900 | $2,572 | Not Implemented |
LM0055 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,231 | $1,300 | Implemented |
LM0055 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40,209 | $27,572 | Implemented |
LM0055 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,748 | $10,240 | Not Implemented |
LM0055 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,172 | $120 | Implemented |
AS0348 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $93,399 | $45,312 | Not Implemented |
AS0348 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $413 | $2,000 | Implemented |
AS0348 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,021 | $450 | Implemented |
AS0348 # 03 Y:2003 | 03 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,000 | $15,500 | Not Implemented |
AS0348 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,361 | $16,680 | Implemented |
AS0348 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $164 | $101 | Implemented |
MA0528 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,167 | $9,862 | Not Implemented |
MA0528 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $2,103 | $1,325 | Implemented |
MA0528 # 04 Y:2003 | 04 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,752 | $0 | Implemented |
MA0528 # 02 Y:2003 | 02 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,180 | $16,000 | Not Implemented |
MA0528 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,973 | $48,190 | Not Implemented |