Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
125
matching recommendationsSIC | 3645 | Residential Lighting Fixtures |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0345 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,809 | $49,405 | Implemented |
WV0345 # 13 Y:2006 | 13 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,389 | $6,500 | Not Implemented |
WV0345 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,653 | $26,300 | Not Implemented |
WV0345 # 09 Y:2006 | 09 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,834 | $10,400 | Not Implemented |
WV0345 # 12 Y:2006 | 12 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $5,468 | $800 | Implemented |
WV0345 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,402 | $1,000 | Implemented |
WV0345 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $390,000 | $140,000 | n/a |
WV0345 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,574 | $60,657 | Implemented |
WV0345 # 07 Y:2006 | 07 | 2006 | REDUCE VENTILATION AIR | $10,829 | $6,280 | Not Implemented |
WV0345 # 02 Y:2006 | 02 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $38,402 | $8,000 | Not Implemented |
WV0345 # 11 Y:2006 | 11 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,570 | $0 | Not Implemented |
WV0345 # 06 Y:2006 | 06 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $14,670 | $1,000 | Implemented |
WV0345 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,346 | $2,805 | Implemented |
WI0462 # 08 Y:2004 | 08 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $369 | $438 | Not Implemented |
WI0462 # 01 Y:2004 | 01 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $30,420 | $36,000 | Not Implemented |
WI0462 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $798 | $840 | Not Implemented |
WI0462 # 02 Y:2004 | 02 | 2004 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,389 | $14,000 | Not Implemented |
WI0462 # 06 Y:2004 | 06 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $808 | $2,500 | Not Implemented |
WI0462 # 04 Y:2004 | 04 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,136 | $1,800 | Not Implemented |
WI0462 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,319 | $500 | Not Implemented |
WI0462 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,916 | $8,000 | Not Implemented |
WI0457 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $331 | $740 | Not Implemented |
WI0457 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $936 | $200 | Not Implemented |
WI0457 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,805 | $11,000 | Not Implemented |
WI0457 # 04 Y:2003 | 04 | 2003 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,413 | $0 | Not Implemented |