IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
Reset
SIC 3646 Commercial Lighting Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0091 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,092 $500 Implemented
RU0091 # 09 Y:1990 09 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $347 $239 Implemented
RU0091 # 10 Y:1990 10 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $946 $402 Implemented
RU0078 # 01 Y:1990 01 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $251 $102 Not Implemented
RU0078 # 02 Y:1990 02 1990 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,842 $0 Implemented
RU0078 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $3,507 $0 Not Implemented
RU0078 # 04 Y:1990 04 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $1,019 $1,880 Not Implemented
RU0078 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,583 $12,800 Not Implemented
RU0078 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $487 $0 Not Implemented
RU0078 # 07 Y:1990 07 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,389 $650 Not Implemented
TN0368 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,877 $0 Not Implemented
TN0368 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,310 $2,994 Not Implemented
TN0368 # 03 Y:1989 03 1989 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $5,212 $7,800 Not Implemented
TN0368 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $3,470 $1,190 Not Implemented
TN0368 # 05 Y:1989 05 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,946 $1,470 Not Implemented
TN0368 # 06 Y:1989 06 1989 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $6,287 $25,000 Not Implemented
TN0368 # 07 Y:1989 07 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,013 $0 Not Implemented
TN0368 # 08 Y:1989 08 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $1,328 $450 Not Implemented
TN0368 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $319 $360 Not Implemented
TN0218 # 01 Y:1984 01 1984 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $8,908 $15,000 Not Implemented
TN0218 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,382 $0 Not Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,746 $180 Not Implemented
TN0218 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,078 $4,350 Not Implemented
TN0218 # 06 Y:1984 06 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $758 $0 Not Implemented