IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 3647 Vehicular Lighting Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0450 # 06 Y:1992 06 1992 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Implemented
TN0450 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $706 $890 Implemented
TN0450 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $414 $316 Implemented
TN0450 # 02 Y:1992 02 1992 IMPROVE LUBRICATION PRACTICES $788 $300 Implemented
TN0450 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,646 $860 Implemented
TN0450 # 05 Y:1992 05 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,058 $0 Implemented
WI0106 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $32,440 $10,800 Not Implemented
WI0106 # 12 Y:1991 12 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,220 $0 Not Implemented
WI0106 # 02 Y:1991 02 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,780 $10,000 Not Implemented
WI0106 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,727 $3,515 Not Implemented
WI0106 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,862 $800 Not Implemented
WI0106 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,351 $600 Not Implemented
WI0106 # 06 Y:1991 06 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,015 $500 Not Implemented
WI0106 # 07 Y:1991 07 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $958 $1,000 Not Implemented
WI0106 # 08 Y:1991 08 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $912 $1,500 Not Implemented
WI0106 # 09 Y:1991 09 1991 INSTALL STORM WINDOWS AND DOORS $733 $1,544 Not Implemented
WI0106 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $383 $0 Not Implemented
WI0106 # 11 Y:1991 11 1991 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $299 $0 Not Implemented
KU0246 # 08 Y:1988 08 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $116 $0 Implemented
KU0246 # 07 Y:1988 07 1988 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $239 $200 Implemented
KU0246 # 06 Y:1988 06 1988 INSULATE BARE EQUIPMENT $791 $200 Not Implemented
KU0246 # 04 Y:1988 04 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,886 $3,600 Implemented
KU0246 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,601 $300 Implemented
KU0246 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $2,577 $800 Implemented
KU0246 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,686 $1,650 Implemented