IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
SIC 365 Household Audio And Video Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0643 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $340 Implemented
CO0643 # 02 Y:2010 02 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $4,470 $27,000 Not Implemented
CO0643 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,270 $1,680 Not Implemented
CO0643 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $33,822 Implemented
CO0643 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $270 $1,290 Not Implemented
MA0629 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $351 $400 Implemented
MA0629 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $450 $1,620 Implemented
MA0629 # 01 Y:2008 01 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,363 $2,800 Implemented
MA0629 # 02 Y:2008 02 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $2,100 Not Implemented
MA0629 # 04 Y:2008 04 2008 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $1,367 $3,000 Not Implemented
MA0629 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $247 $200 Implemented
MA0629 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,726 $6,800 Not Implemented
GT0783 # 03 Y:2004 03 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,110 $3,700 Not Implemented
GT0783 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $5,000 $1,500 Implemented
GT0783 # 01 Y:2004 01 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,670 $3,000 Not Implemented
GT0783 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $35,410 $0 Implemented
GT0783 # 05 Y:2004 05 2004 METER WASTE WATER $33,200 $2,000 Implemented
GT0783 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,242 $20,982 Implemented
GT0783 # 06 Y:2004 06 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,190 $1,020 Implemented
GT0783 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $1,250 Implemented
GT0783 # 08 Y:2004 08 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,875 $655 Implemented
MS0213 # 01 Y:2002 01 2002 INSTALL TIMERS AND/OR THERMOSTATS $23,960 $13,625 Not Implemented
MS0213 # 03 Y:2002 03 2002 DISCONNECT BALLASTS $1,168 $660 Not Implemented
MS0213 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $377 $455 Not Implemented
MS0213 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $227 Not Implemented