IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,411

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0018 # 06 Y:1985 06 1985 USE OPTIMUM THICKNESS INSULATION $550 $210 Implemented
CO0018 # 07 Y:1985 07 1985 INSTALL TIMERS AND/OR THERMOSTATS $8,891 $2,400 Implemented
CO0018 # 08 Y:1985 08 1985 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $246 $50 Implemented
TS0010 # 01 Y:1985 01 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,024 $1,500 Implemented
TS0010 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $876 $94 Implemented
TS0010 # 03 Y:1985 03 1985 REDUCE VENTILATION AIR $4,602 $460 Implemented
TS0010 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $158 $25 Implemented
MA0008 # 01 Y:1984 01 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $79 $0 Implemented
MA0008 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $623 $1,079 Implemented
CO0012 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,286 $600 Implemented
CO0012 # 02 Y:1984 02 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,583 $500 Implemented
CO0012 # 03 Y:1984 03 1984 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $409 $600 Implemented
CO0012 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,186 $400 Implemented
CO0012 # 05 Y:1984 05 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,101 $6 Implemented
CO0012 # 06 Y:1984 06 1984 INSTALL TIMERS AND/OR THERMOSTATS $16,597 $4,000 Implemented
CO0012 # 07 Y:1984 07 1984 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $1,984 $1,160 Implemented
CO0012 # 08 Y:1984 08 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $241 $17 Implemented
OK0147 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,650 $6,252 Implemented
OK0147 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,120 $1,236 Implemented
OK0147 # 06 Y:1984 06 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $566 $333 Implemented
OK0147 # 07 Y:1984 07 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,671 $1,647 Implemented
OK0147 # 08 Y:1984 08 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,036 $720 Implemented
OK0147 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $492 $291 Implemented
OK0147 # 10 Y:1984 10 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $6,362 $1,090 Implemented
OK0147 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,160 $900 Implemented