IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,411

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0715 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,830 $4,560 Implemented
AM0715 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $0 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
MI0298 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $34,838 $36,314 Implemented
MI0298 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,018 $53,398 Implemented
MI0298 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,660 Implemented
MA0756 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,102 $6,500 Implemented
MA0756 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,797 $7,000 Implemented
MI0294 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,734 $29,594 Implemented
MI0294 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,388 $1,660 Implemented
MI0294 # 05 Y:2016 05 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,921 $1,441 Implemented
MI0294 # 07 Y:2016 07 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,081 $4,200 Implemented
MI0294 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,830 $40 Implemented
MI0294 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,797 $40 Implemented
MI0294 # 16 Y:2016 16 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $342 $375 Implemented
DL0149 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,780 $0 Implemented
DL0149 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,060 $35 Implemented
DL0149 # 05 Y:2015 05 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,140 $40 Implemented
DL0149 # 06 Y:2015 06 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $870 $50 Implemented
DL0149 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,930 $7,440 Implemented
DL0149 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $1,430 Implemented
DL0149 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $3,200 Implemented
DL0149 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $1,200 Implemented