Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
473
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0656 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,299 | $3,896 | n/a |
SD0656 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,836 | $74,485 | n/a |
SD0656 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,784 | $2,109 | n/a |
SD0656 # 04 Y:2024 | 04 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $54,151 | $15,130 | n/a |
SD0656 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $54,943 | $3,087 | n/a |
SD0656 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,042 | $11,447 | n/a |
SD0656 # 01 Y:2024 | 01 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,203 | $18,032 | n/a |
SD0656 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,188 | $500 | n/a |
SD0656 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,422 | $2,040 | n/a |
SD0656 # 05 Y:2024 | 05 | 2024 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,144 | $2,200 | n/a |
SD0656 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,164 | $2,109 | n/a |
SD0656 # 09 Y:2024 | 09 | 2024 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $35,678 | $51,900 | n/a |
SJ0009 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,746 | $441,525 | Not Implemented |
SJ0009 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $764 | $32 | Implemented |
SJ0009 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,699 | $844 | Implemented |
SJ0009 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $469 | $0 | Not Implemented |
SJ0009 # 09 Y:2024 | 09 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,761 | $2,675 | Not Implemented |
SJ0009 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $513 | $624 | Implemented |
SJ0009 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8 | $200 | Implemented |
SJ0009 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,705 | $0 | Implemented |
SJ0009 # 10 Y:2024 | 10 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $147 | $50 | Implemented |
SJ0009 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,869 | $18,228 | Not Implemented |
SD0637 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,393 | $700 | Implemented |
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $250 | Implemented |