IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0826 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $979 $1,631 Implemented
MA0826 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $552 $250 Not Implemented
MA0826 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $551 $1,450 Implemented
MA0826 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $323 $625 Not Implemented
LE0507 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $746 $40 Not Implemented
LE0507 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,952 $14,000 Not Implemented
LE0507 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,002 $32,400 Not Implemented
LE0507 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,172 $24,000 Not Implemented
DL0190 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $180 $0 Implemented
DL0190 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,910 $0 Implemented
DL0190 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $324 $50 Implemented
DL0190 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,650 $0 Implemented
DL0190 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $1,200 Not Implemented
DL0190 # 06 Y:2021 06 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $270 $0 Implemented
DL0190 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $560 $550 Not Implemented
DL0190 # 08 Y:2021 08 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,730 $2,453 Not Implemented
SF0560 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,246 $70 Not Implemented
SF0560 # 02 Y:2020 02 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,680 $26,850 Not Implemented
SF0560 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $4,726 $14,983 Implemented
SF0560 # 04 Y:2020 04 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,118 $45,851 Implemented
SF0560 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $15,645 $78,611 Implemented
CL2007 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,082 $10,098 Implemented
CL2007 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $936 $5,431 Implemented
CL2007 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $58,440 $10,000 Not Implemented
CL2007 # 04 Y:2020 04 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $637 $630 Not Implemented