IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0410 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,273 $210 Implemented
WV0410 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $1,430 $5,800 Not Implemented
WV0410 # 04 Y:2010 04 2010 IMPROVE LUBRICATION PRACTICES $1,907 $618 Implemented
WV0410 # 03 Y:2010 03 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,551 $2,200 Implemented
WV0410 # 02 Y:2010 02 2010 AIR CONDITION ONLY SPACE NECESSARY $6,499 $900 Not Implemented
WV0410 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $92,924 $0 Implemented
WV0344 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,355 $12,137 Implemented
WV0344 # 01 Y:2006 01 2006 DEVELOP A REPAIR/REPLACE POLICY $50,956 $1,472 Implemented
WV0344 # 02 Y:2006 02 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $41,030 $1,000 Implemented
WV0344 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,895 $15 Not Implemented
WV0344 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,182 $27,387 Implemented
WV0344 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $18,000 $32,500 Implemented
WV0344 # 06 Y:2006 06 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,147 $26,662 Implemented
WV0344 # 14 Y:2006 14 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $217 $100 Not Implemented
WV0344 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,197 $1,811 Implemented
WV0344 # 12 Y:2006 12 2006 ISOLATE HOT OR COLD EQUIPMENT $1,256 $1,500 Not Implemented
WV0344 # 11 Y:2006 11 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,355 $436 Implemented
WV0344 # 10 Y:2006 10 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,177 $1,896 Implemented
WV0344 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,629 $0 Implemented
WV0344 # 07 Y:2006 07 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,710 $44 Not Implemented
OD0149 # 05 Y:1999 05 1999 RECOVER AND REUSE COOLING WATER $17,077 $10,098 Not Implemented
OD0149 # 04 Y:1999 04 1999 METER WASTE WATER $3,741 $4,595 Not Implemented
OD0149 # 03 Y:1999 03 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,940 $1,972 Not Implemented
OD0149 # 02 Y:1999 02 1999 REPAIR OR REPLACE STEAM TRAPS $10,071 $450 Not Implemented
OD0149 # 01 Y:1999 01 1999 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $26,618 $64,698 Not Implemented