Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,199
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0012 # 06 Y:2012 | 06 | 2012 | AIR CONDITION ONLY SPACE NECESSARY | $597 | $975 | Not Implemented |
WM0012 # 07 Y:2012 | 07 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $62 | $128 | Implemented |
AM0623 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $75,600 | $270,000 | Not Implemented |
AM0623 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,800 | $13,240 | Not Implemented |
AM0623 # 03 Y:2012 | 03 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $36,640 | $10,000 | Not Implemented |
AM0623 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,838 | $500 | Not Implemented |
AM0623 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,538 | $1,045 | Not Implemented |
AM0623 # 06 Y:2012 | 06 | 2012 | OPTIMIZE PLANT POWER FACTOR | $4,500 | $8,160 | Not Implemented |
AM0623 # 07 Y:2012 | 07 | 2012 | TREAT AND REUSE RINSE WATERS | $3,300 | $3,000 | Not Implemented |
AM0623 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $3,100 | $570 | Not Implemented |
AM0623 # 09 Y:2012 | 09 | 2012 | USE SYNTHETIC LUBRICANT | $1,010 | $0 | Not Implemented |
AM0621 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,680 | $1,000 | Implemented |
AM0621 # 04 Y:2012 | 04 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $220 | $0 | Not Implemented |
AM0621 # 01 Y:2012 | 01 | 2012 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $23,375 | $50,000 | Not Implemented |
AM0621 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,750 | $11,600 | Implemented |
MA0699 # 01 Y:2012 | 01 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $25,140 | $9,900 | Implemented |
MA0699 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,627 | $104,325 | Implemented |
MA0699 # 03 Y:2012 | 03 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $5,019 | $24,000 | Implemented |
MA0699 # 04 Y:2012 | 04 | 2012 | ELIMINATE/REDUCE AN OPERATION | $1,855 | $500 | Not Implemented |
MA0699 # 05 Y:2012 | 05 | 2012 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,250 | $6,500 | Implemented |
MA0699 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $706 | $100 | Implemented |
MAS028 # 01 Y:2012 | 01 | 2012 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $37,819 | $31,800 | Implemented |
MAS028 # 02 Y:2012 | 02 | 2012 | REDUCE VENTILATION AIR | $22,269 | $9,650 | Not Implemented |
MAS028 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,815 | $4,000 | Implemented |
MAS028 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,781 | $0 | Not Implemented |