IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0681 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $930 $1,360 Implemented
UD0681 # 12 Y:2003 12 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $230 Not Implemented
UD0681 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $159 $46 Implemented
UD0681 # 14 Y:2003 14 2003 INSTALL OCCUPANCY SENSORS $105 $160 Not Implemented
CO0528 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,940 $4,360 Implemented
CO0528 # 02 Y:2003 02 2003 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $13,340 $14,640 Not Implemented
CO0528 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,850 $16,010 Not Implemented
CO0528 # 04 Y:2003 04 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,000 $3,000 Not Implemented
CO0528 # 05 Y:2003 05 2003 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,720 $13,150 Not Implemented
CO0528 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,940 $10,310 Not Implemented
LM0066 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $670 $68 Not Implemented
LM0066 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,653 $1,794 Not Implemented
LM0066 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $20 Implemented
LM0066 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,818 $0 Implemented
LM0066 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,443 $102 Not Implemented
LM0066 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $92 $87 Not Implemented
LM0066 # 07 Y:2004 07 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,730 $11,000 Not Implemented
OR0432 # 01 Y:2003 01 2003 RECYCLE SPENT TANNING SOLUTION $136,000 $280,000 Not Implemented
OR0432 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,900 $32,000 Implemented
OR0432 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,830 $1,200 Implemented
OR0432 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,230 $7,640 Implemented
OR0432 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $8,813 $8,813 Not Implemented
TA0059 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $9,950 $0 Not Implemented
TA0059 # 02 Y:2003 02 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,536 $500 Not Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented