IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0198 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,800 $5,000 Implemented
HO0198 # 08 Y:1999 08 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,228 $10,000 Implemented
MA0402 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $217,449 $140,000 Not Implemented
MA0402 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $61,092 $16,597 Not Implemented
MA0402 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,628 $6,075 Not Implemented
MA0402 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,721 $4,925 Not Implemented
MA0402 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,577 $4,275 Not Implemented
MA0402 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,257 $200 Not Implemented
HO0152 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,638 $5,469 Not Implemented
HO0152 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $241 $245 Not Implemented
HO0152 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $482 $400 Not Implemented
HO0152 # 04 Y:1997 04 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,241 $6,000 Not Implemented
HO0152 # 05 Y:1997 05 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,832 $10,000 Not Implemented
HO0152 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,500 $6,500 Not Implemented
HO0152 # 07 Y:1997 07 1997 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $32,500 $6,000 Not Implemented
HO0152 # 08 Y:1997 08 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $3,963 $1,500 Not Implemented
HO0111 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,207 $8,017 Not Implemented
HO0111 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $556 Not Implemented
HO0111 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122 $237 Not Implemented
HO0111 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $296 $200 Not Implemented
HO0111 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $173 $95 Not Implemented
HO0111 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $197 $206 Not Implemented
HO0111 # 07 Y:1995 07 1995 INSTALL OCCUPANCY SENSORS $862 $400 Not Implemented
HO0111 # 08 Y:1995 08 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $211 $60 Not Implemented