IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0120 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,166 $1,030 Implemented
SD0120 # 02 Y:1995 02 1995 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $77,121 $121,250 Implemented
SD0120 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,871 $2,761 Implemented
SD0120 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $809 $1,970 Implemented
SD0120 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,430 $5,990 Implemented
SD0120 # 06 Y:1995 06 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $6,836 $3,940 Implemented
SD0120 # 07 Y:1995 07 1995 INSTALL OCCUPANCY SENSORS $1,161 $880 Not Implemented
SF0056 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $708 Implemented
SF0056 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,130 $4,400 Implemented
SF0056 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,070 $21,000 Not Implemented
SF0056 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,751 $250 Implemented
SF0056 # 05 Y:1995 05 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $87,599 $18,750 Implemented
SF0056 # 06 Y:1995 06 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $56,940 $140,000 Implemented
SF0056 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $791 $1,680 Implemented
SF0056 # 08 Y:1995 08 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $194,002 $547,100 Not Implemented
SF0056 # 09 Y:1995 09 1995 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $29,556 $3,040 Implemented
SF0056 # 10 Y:1995 10 1995 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $1,680 $3,546 Implemented
SF0056 # 11 Y:1995 11 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,490 $0 Implemented
SF0056 # 12 Y:1995 12 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $177,738 $250,240 Not Implemented
MA0333 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,356 $30,750 Not Implemented
MA0333 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $4,592 $9,500 Implemented
MA0333 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,119 $1,800 Not Implemented
MA0333 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $588 $800 Implemented
MA0333 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $412 $461 Implemented
IA0109 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,253 $20,116 Implemented