IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0190 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,910 $0 Implemented
DL0190 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $324 $50 Implemented
DL0190 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,650 $0 Implemented
DL0190 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $361 $1,200 Not Implemented
DL0190 # 06 Y:2021 06 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $270 $0 Implemented
DL0190 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $560 $550 Not Implemented
DL0190 # 08 Y:2021 08 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,730 $2,453 Not Implemented
DL0190 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $180 $0 Implemented
LE0240 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,770 $139,872 Not Implemented
LE0240 # 08 Y:2006 08 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $300 Implemented
LE0240 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $300 Implemented
LE0240 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,994 $500 Implemented
LE0240 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,178 $4,500 Implemented
LE0240 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,308 $2,500 Implemented
LE0240 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,974 $2,092 Implemented
LE0240 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $74,790 $800 Not Implemented
LE0240 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $265,405 $500,000 Implemented
LE0135 # 08 Y:2002 08 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,654 $630 Implemented
LE0135 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $62,395 $12,000 Implemented
LE0135 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $1,066 $200 Implemented
LE0135 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,792 $0 Implemented
LE0135 # 04 Y:2002 04 2002 COVER OPEN TANKS $4,639 $12,000 Not Implemented
LE0135 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,451 $0 Implemented
LE0135 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,721 $2,500 Not Implemented
LE0135 # 01 Y:2002 01 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,955 $2,500 Not Implemented