Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0217 # 13 Y:2023 | 13 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,390 | $11,744 | Not Implemented |
DL0217 # 12 Y:2023 | 12 | 2023 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,950 | $25,000 | Not Implemented |
DL0217 # 11 Y:2023 | 11 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,318 | $4,100 | Implemented |
DL0217 # 10 Y:2023 | 10 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,110 | $5,000 | Not Implemented |
DL0217 # 09 Y:2023 | 09 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,708 | $15,000 | Not Implemented |
DL0217 # 08 Y:2023 | 08 | 2023 | REDUCE VENTILATION AIR | $1,715 | $750 | Implemented |
DL0217 # 01 Y:2023 | 01 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,180 | $0 | Implemented |
DL0217 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,621 | $0 | Implemented |
DL0217 # 03 Y:2023 | 03 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $112,250 | $0 | Not Implemented |
DL0217 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,120 | $0 | Implemented |
DL0217 # 05 Y:2023 | 05 | 2023 | REDUCE VENTILATION AIR | $29,580 | $0 | Implemented |
DL0217 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $30,600 | $0 | Implemented |
DL0217 # 07 Y:2023 | 07 | 2023 | REDUCE VENTILATION AIR | $2,650 | $0 | Implemented |
DL0173 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,435 | $15,000 | Implemented |
DL0173 # 07 Y:2017 | 07 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,800 | $3,940 | Not Implemented |
DL0173 # 06 Y:2017 | 06 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $17,600 | $5,950 | Implemented |
DL0173 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,364 | $654 | Not Implemented |
DL0173 # 04 Y:2017 | 04 | 2017 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,676 | $1,375 | Implemented |
DL0173 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,100 | $9,375 | Not Implemented |
DL0173 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $20,880 | $0 | Implemented |
WV0410 # 05 Y:2010 | 05 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $1,430 | $5,800 | Not Implemented |
WV0410 # 02 Y:2010 | 02 | 2010 | AIR CONDITION ONLY SPACE NECESSARY | $6,499 | $900 | Not Implemented |
WV0410 # 01 Y:2010 | 01 | 2010 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $92,924 | $0 | Implemented |
WV0410 # 04 Y:2010 | 04 | 2010 | IMPROVE LUBRICATION PRACTICES | $1,907 | $618 | Implemented |
WV0410 # 03 Y:2010 | 03 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,551 | $2,200 | Implemented |