IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2007 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,082 $10,098 Implemented
CL2007 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $936 $5,431 Implemented
CL2007 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $58,440 $10,000 Not Implemented
CL2007 # 04 Y:2020 04 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $637 $630 Not Implemented
CL1908 # 02 Y:2019 02 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,401 $5,725 Not Implemented
CL1908 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,809 $11,080 Not Implemented
CL1908 # 04 Y:2019 04 2019 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,156 $0 Not Implemented
CL1908 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,091 $0 Not Implemented
CL1908 # 06 Y:2019 06 2019 APPLY FOR INVESTMENT INCENTIVES $397 $0 Not Implemented
CL1908 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,237 $41,608 Not Implemented
TN0662 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $970 $2,225 Not Implemented
TN0662 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,010 $1,460 Implemented
TN0662 # 04 Y:1999 04 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $14,050 $19,800 Implemented
TN0662 # 03 Y:1999 03 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,380 $4,260 Not Implemented
TN0662 # 02 Y:1999 02 1999 MODIFY CURRENT INCENTIVE PROGRAM $45,000 $30,000 Implemented
TN0662 # 01 Y:1999 01 1999 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $55,900 $90,000 Not Implemented
TN0412 # 06 Y:1990 06 1990 IMPROVE LUBRICATION PRACTICES $4,345 $0 Not Implemented
TN0412 # 05 Y:1990 05 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,740 $2,460 Not Implemented
TN0412 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,317 $1,500 Implemented
TN0412 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,159 $0 Implemented
TN0412 # 02 Y:1990 02 1990 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $11,598 $10,600 Not Implemented
TN0412 # 01 Y:1990 01 1990 USE MINIMUM STEAM OPERATING PRESSURE $46,500 $0 Implemented