IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0154 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $0 Not Implemented
TN0154 # 03 Y:1982 03 1982 INSTALL SET-BACK TIMERS $642 $2,100 Not Implemented
TN0154 # 02 Y:1982 02 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,418 $3,500 Not Implemented
TN0154 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $25 Not Implemented
UD0037 # 05 Y:1982 05 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,974 $6,500 Not Implemented
UD0037 # 04 Y:1982 04 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,573 $3,500 Implemented
UD0037 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,116 $300 Not Implemented
UD0037 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $350 $0 Not Implemented
UD0037 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $935 $379 Not Implemented
GT0117 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $500 Not Implemented
GT0117 # 03 Y:1982 03 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,298 $1,500 Not Implemented
GT0117 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,669 $5,792 Not Implemented
GT0117 # 01 Y:1982 01 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,518 $2,760 Not Implemented
KU0040 # 05 Y:1982 05 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,235 $1,050 Not Implemented
KU0040 # 04 Y:1982 04 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $332 $0 Not Implemented
KU0040 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $180 Not Implemented
KU0040 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $4,812 $12,000 Not Implemented
KU0040 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,624 $6,466 Not Implemented
UD0027 # 01 Y:1982 01 1982 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,701 $624 Not Implemented
UD0027 # 02 Y:1982 02 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $500 Not Implemented
UD0027 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,458 $0 Not Implemented