Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
238
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0349 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,690 | $470 | Not Implemented |
CO0349 # 04 Y:1995 | 04 | 1995 | INSTALL OCCUPANCY SENSORS | $3,030 | $2,280 | Not Implemented |
CO0349 # 07 Y:1995 | 07 | 1995 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $990 | $10,410 | Not Implemented |
CO0349 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,640 | $54,100 | Implemented |
CO0349 # 05 Y:1995 | 05 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,860 | $4,470 | Not Implemented |
CO0349 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,690 | $7,000 | Implemented |
CO0349 # 02 Y:1995 | 02 | 1995 | RECOVER AND REUSE COOLING WATER | $18,410 | $2,190 | Implemented |
UF0132 # 07 Y:1995 | 07 | 1995 | USE POWER DURING OFF-PEAK PERIODS | $3,802 | $0 | Not Implemented |
UF0132 # 02 Y:1995 | 02 | 1995 | INSTALL OCCUPANCY SENSORS | $4,087 | $192 | Not Implemented |
UF0132 # 04 Y:1995 | 04 | 1995 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,399 | $40,610 | Not Implemented |
UF0132 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,637 | $32,604 | Implemented |
UF0132 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,055 | $1,094 | Implemented |
UF0132 # 06 Y:1995 | 06 | 1995 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,950 | $15,000 | Not Implemented |
UF0132 # 05 Y:1995 | 05 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,768 | $350 | Implemented |
CO0345 # 01 Y:1995 | 01 | 1995 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $153,900 | $340,000 | Not Implemented |
CO0345 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,920 | $44,400 | Not Implemented |
CO0345 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,520 | $2,490 | Implemented |
CO0345 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,320 | $490 | Implemented |
CO0345 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $140 | $280 | Not Implemented |
UF0124 # 05 Y:1995 | 05 | 1995 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,043 | $0 | Implemented |
UF0124 # 06 Y:1995 | 06 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $413 | $950 | Not Implemented |
UF0124 # 09 Y:1995 | 09 | 1995 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,157 | $5,000 | Not Implemented |
UF0124 # 04 Y:1995 | 04 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $222 | $700 | Implemented |
UF0124 # 03 Y:1995 | 03 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,637 | $350 | Implemented |
UF0124 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,076 | $4,354 | Implemented |