IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0349 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,690 $470 Not Implemented
CO0349 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $3,030 $2,280 Not Implemented
CO0349 # 07 Y:1995 07 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $990 $10,410 Not Implemented
CO0349 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,640 $54,100 Implemented
CO0349 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,860 $4,470 Not Implemented
CO0349 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,690 $7,000 Implemented
CO0349 # 02 Y:1995 02 1995 RECOVER AND REUSE COOLING WATER $18,410 $2,190 Implemented
UF0132 # 07 Y:1995 07 1995 USE POWER DURING OFF-PEAK PERIODS $3,802 $0 Not Implemented
UF0132 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $4,087 $192 Not Implemented
UF0132 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,399 $40,610 Not Implemented
UF0132 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,637 $32,604 Implemented
UF0132 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,055 $1,094 Implemented
UF0132 # 06 Y:1995 06 1995 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,950 $15,000 Not Implemented
UF0132 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,768 $350 Implemented
CO0345 # 01 Y:1995 01 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $153,900 $340,000 Not Implemented
CO0345 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,920 $44,400 Not Implemented
CO0345 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,520 $2,490 Implemented
CO0345 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,320 $490 Implemented
CO0345 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $140 $280 Not Implemented
UF0124 # 05 Y:1995 05 1995 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,043 $0 Implemented
UF0124 # 06 Y:1995 06 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $413 $950 Not Implemented
UF0124 # 09 Y:1995 09 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,157 $5,000 Not Implemented
UF0124 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $222 $700 Implemented
UF0124 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,637 $350 Implemented
UF0124 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,076 $4,354 Implemented