Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0168 # 07 Y:2008 | 07 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $33,795 | $22,516 | Implemented |
MI0168 # 06 Y:2008 | 06 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,677 | $3,475 | Not Implemented |
MI0168 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |
MI0168 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,060 | $1,210 | Implemented |
MI0168 # 08 Y:2008 | 08 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,202 | $3,320 | Implemented |
MI0168 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,290 | $43,681 | Implemented |
MI0168 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $60,893 | $2,040 | Implemented |
MI0168 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $256,906 | $645,000 | Not Implemented |
MA0640 # 01 Y:2008 | 01 | 2008 | REDUCE VENTILATION AIR | $36,692 | $39,000 | Implemented |
MA0640 # 02 Y:2008 | 02 | 2008 | OPTIMIZE PLANT POWER FACTOR | $11,811 | $11,850 | Implemented |
MA0640 # 03 Y:2008 | 03 | 2008 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,640 | $43,000 | Not Implemented |
MA0640 # 04 Y:2008 | 04 | 2008 | MINIMIZE WATER USAGE | $4,210 | $18,000 | Not Implemented |
MA0640 # 05 Y:2008 | 05 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $1,895 | $3,000 | Implemented |
MA0640 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $0 | Implemented |
MA0640 # 07 Y:2008 | 07 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $644 | $689 | Implemented |
OK0765 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,974 | $18,623 | Implemented |
OK0765 # 06 Y:2008 | 06 | 2008 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $42,105 | $161,000 | Implemented |
OK0765 # 04 Y:2008 | 04 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,176 | $4,690 | Not Implemented |
OK0765 # 01 Y:2008 | 01 | 2008 | INSTALL OCCUPANCY SENSORS | $1,794 | $2,151 | Not Implemented |
OK0765 # 03 Y:2008 | 03 | 2008 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,600 | $0 | Not Implemented |
OK0765 # 02 Y:2008 | 02 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $340 | $0 | Implemented |
MI0166 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |
MI0166 # 06 Y:2008 | 06 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,677 | $3,475 | Not Implemented |
MI0166 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $70,996 | $1,200 | Implemented |
MI0166 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $360,093 | $695,000 | Not Implemented |