Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 367 | Electronic Components And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0715 # 02 Y:2016 | 02 | 2016 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $53,960 | $0 | Not Implemented |
AM0715 # 03 Y:2016 | 03 | 2016 | USE SOLAR HEAT FOR HEAT | $31,594 | $151,288 | Implemented |
AM0715 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,530 | $50,830 | Implemented |
AM0715 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,750 | $50 | Implemented |
AM0715 # 06 Y:2016 | 06 | 2016 | USE OPTIMUM TEMPERATURE | $8,060 | $9,230 | Not Implemented |
AM0715 # 07 Y:2016 | 07 | 2016 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,830 | $4,560 | Implemented |
AM0715 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $305 | $0 | Implemented |
AM0715 # 01 Y:2016 | 01 | 2016 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $566,490 | $1,145,213 | Not Implemented |
OK0942 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $4,623 | Implemented |
OK0942 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $600 | $3,450 | Implemented |
OK0942 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $469,328 | $2,302,430 | Not Implemented |
OK0942 # 04 Y:2016 | 04 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $73,902 | $31,000 | Not Implemented |
OK0942 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,767 | $3,112 | Implemented |
OK0942 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,283 | $8,000 | Not Implemented |
SU0412 # 08 Y:2016 | 08 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,742 | $6,797 | Not Implemented |
SU0412 # 09 Y:2016 | 09 | 2016 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $119 | $576 | Not Implemented |
SU0412 # 02 Y:2016 | 02 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,342 | $480 | Not Implemented |
SU0412 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,305 | $1,707 | Not Implemented |
SU0412 # 05 Y:2016 | 05 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,474 | $3,632 | Not Implemented |
SU0412 # 01 Y:2016 | 01 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $154 | $0 | Not Implemented |
SU0412 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $98 | $78 | Not Implemented |
SU0412 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $296 | $169 | Not Implemented |
SU0412 # 07 Y:2016 | 07 | 2016 | ELIMINATE/REDUCE AN OPERATION | $5,577 | $9,195 | Not Implemented |
MI0298 # 03 Y:2016 | 03 | 2016 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $16,796 | $40,060 | Not Implemented |
MI0298 # 05 Y:2016 | 05 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,324 | $3,985 | Not Implemented |