Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
844
matching recommendationsSIC | 3672 | Printed Circuit Boards |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0030 # 01 Y:2009 | 01 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,479 | $0 | Implemented |
UA0030 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,368 | $1,500 | Implemented |
UA0030 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,426 | $3,200 | Not Implemented |
UA0030 # 04 Y:2009 | 04 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $60 | $66 | Not Implemented |
UA0030 # 05 Y:2009 | 05 | 2009 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $174 | $0 | Implemented |
UA0030 # 06 Y:2009 | 06 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,168 | $80,743 | Implemented |
UA0030 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,173 | $14,708 | Implemented |
MI0168 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $256,906 | $645,000 | Not Implemented |
MI0168 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $60,893 | $2,040 | Implemented |
MI0168 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,290 | $43,681 | Implemented |
MI0168 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,060 | $1,210 | Implemented |
MI0168 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |
MI0168 # 06 Y:2008 | 06 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,677 | $3,475 | Not Implemented |
MI0168 # 07 Y:2008 | 07 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $33,795 | $22,516 | Implemented |
MI0168 # 08 Y:2008 | 08 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,202 | $3,320 | Implemented |
MI0166 # 01 Y:2008 | 01 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $360,093 | $695,000 | Not Implemented |
MI0166 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $70,996 | $1,200 | Implemented |
MI0166 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,899 | $41,800 | Implemented |
MI0166 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,060 | $1,210 | Implemented |
MI0166 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $40 | Implemented |
MI0166 # 06 Y:2008 | 06 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,677 | $3,475 | Not Implemented |
MA0613 # 01 Y:2007 | 01 | 2007 | REDUCE VENTILATION AIR | $22,488 | $15,475 | Implemented |
MA0613 # 02 Y:2007 | 02 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,346 | $54,617 | Implemented |
MA0613 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,574 | $53,250 | Implemented |
MA0613 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $20,408 | $15,900 | Not Implemented |