Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 3672 | Printed Circuit Boards |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0402 # 01 Y:1997 | 01 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $217,449 | $140,000 | Not Implemented |
MA0402 # 02 Y:1997 | 02 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $61,092 | $16,597 | Not Implemented |
MA0402 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,628 | $6,075 | Not Implemented |
MA0402 # 04 Y:1997 | 04 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,721 | $4,925 | Not Implemented |
MA0402 # 05 Y:1997 | 05 | 1997 | OPTIMIZE PLANT POWER FACTOR | $2,577 | $4,275 | Not Implemented |
MA0402 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,257 | $200 | Not Implemented |
SD0177 # 12 Y:1997 | 12 | 1997 | INSTALL SYSTEM TO COLLECT SCRAP | $69,638 | $20,000 | Implemented |
SD0177 # 11 Y:1997 | 11 | 1997 | RECOVER AND REUSE COOLING WATER | $3,300 | $2,000 | Implemented |
SD0177 # 10 Y:1997 | 10 | 1997 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $5,045 | $0 | Implemented |
SD0177 # 09 Y:1997 | 09 | 1997 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $4,758 | $3,000 | Implemented |
SD0177 # 08 Y:1997 | 08 | 1997 | INSTALL SPECTRAL REFLECTORS / DELAMP | $17,960 | $11,180 | Implemented |
SD0177 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,228 | $13,068 | Implemented |
SD0177 # 06 Y:1997 | 06 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,318 | $6,500 | Implemented |
SD0177 # 05 Y:1997 | 05 | 1997 | USE OPTIMUM THICKNESS INSULATION | $1,916 | $720 | Implemented |
SD0177 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $3,056 | $2,170 | Implemented |
SD0177 # 03 Y:1997 | 03 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,154 | $3,900 | Not Implemented |
SD0177 # 02 Y:1997 | 02 | 1997 | REPLACE BOILER | $19,420 | $83,000 | Not Implemented |
SD0177 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,578 | $9,930 | Implemented |
HO0152 # 08 Y:1997 | 08 | 1997 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,963 | $1,500 | Not Implemented |
HO0152 # 07 Y:1997 | 07 | 1997 | IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM | $32,500 | $6,000 | Not Implemented |
HO0152 # 06 Y:1997 | 06 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,500 | $6,500 | Not Implemented |
HO0152 # 05 Y:1997 | 05 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,832 | $10,000 | Not Implemented |
HO0152 # 04 Y:1997 | 04 | 1997 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,241 | $6,000 | Not Implemented |
HO0152 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $482 | $400 | Not Implemented |
HO0152 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $241 | $245 | Not Implemented |