Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0408 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,937 | $38,229 | Not Implemented |
AS0408 # 01 Y:2005 | 01 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $505,076 | $214,240 | Not Implemented |
AS0408 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,472 | $1,000 | Not Implemented |
AS0408 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,575 | $14,371 | Not Implemented |
AS0408 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,267 | $3,000 | Not Implemented |
AS0408 # 04 Y:2005 | 04 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,761 | $24,575 | Not Implemented |
AS0347 # 09 Y:2003 | 09 | 2003 | CLEAR AND RENT EXISTING SPACE | $15,165 | $11,220 | n/a |
AS0347 # 08 Y:2003 | 08 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $64,137 | $800 | Not Implemented |
AS0347 # 07 Y:2003 | 07 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $27,104 | $6,400 | Not Implemented |
AS0347 # 06 Y:2003 | 06 | 2003 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $720 | $40 | Implemented |
AS0347 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $3,155 | $14 | Not Implemented |
AS0347 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,657 | $18,000 | Not Implemented |
AS0347 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,837 | $60 | Implemented |
AS0347 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,330 | $8,920 | Implemented |
AS0347 # 01 Y:2003 | 01 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,462 | $0 | Implemented |
AS0334 # 07 Y:2002 | 07 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,710 | $5,232 | Not Implemented |
AS0334 # 01 Y:2002 | 01 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,317 | $0 | Not Implemented |
AS0334 # 02 Y:2002 | 02 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,247 | $312 | Not Implemented |
AS0334 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $667 | $1,350 | Not Implemented |
AS0334 # 04 Y:2002 | 04 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $424 | $441 | Not Implemented |
AS0334 # 05 Y:2002 | 05 | 2002 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $32,221 | $12,000 | Not Implemented |
AS0334 # 08 Y:2002 | 08 | 2002 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $3,926 | $85 | Not Implemented |
AS0334 # 06 Y:2002 | 06 | 2002 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $3,596 | $60 | Not Implemented |
AS0334 # 10 Y:2002 | 10 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $379 | $546 | Not Implemented |
AS0334 # 09 Y:2002 | 09 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $6,865 | $8,955 | Not Implemented |