Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
595
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0592 # 06 Y:2020 | 06 | 2020 | INSTALL SET-BACK TIMERS | $1,823 | $222 | Implemented |
WV0592 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,832 | $4,720 | Not Implemented |
WV0592 # 04 Y:2020 | 04 | 2020 | MINIMIZE WATER USAGE | $3,145 | $2,100 | Implemented |
WV0592 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,217 | $9,054 | Implemented |
WV0592 # 02 Y:2020 | 02 | 2020 | RECYCLE WHITE WATER | $6,078 | $6,252 | Not Implemented |
WV0592 # 01 Y:2020 | 01 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,201 | $9,500 | Implemented |
OR0726 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,031 | $3,570 | Not Implemented |
OR0726 # 02 Y:2019 | 02 | 2019 | REDUCE VENTILATION AIR | $1,259 | $0 | Implemented |
OR0726 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,581 | $7,570 | Implemented |
OK0991 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $724 | $0 | Implemented |
OK0991 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,710 | $536 | Implemented |
OK0991 # 04 Y:2018 | 04 | 2018 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $5,577 | $1,015 | Implemented |
OK0991 # 03 Y:2018 | 03 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,813 | $0 | Not Implemented |
OK0991 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,248 | $14,404 | Not Implemented |
OK0991 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,462 | $17,053 | Implemented |
SF0528 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,402 | $11,547 | Not Implemented |
SF0528 # 03 Y:2018 | 03 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,178 | $27,403 | Not Implemented |
SF0528 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,330 | $22,874 | Implemented |
AS0439 # 04 Y:2017 | 04 | 2017 | MAINTAIN MACHINES TO REDUCE LEAKS | $734 | $545 | Not Implemented |
AS0439 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,293 | $950 | Implemented |
AS0439 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,146 | $4,770 | Not Implemented |
AS0439 # 01 Y:2017 | 01 | 2017 | INSTALL OCCUPANCY SENSORS | $629 | $650 | Not Implemented |
DL0173 # 07 Y:2017 | 07 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,800 | $3,940 | Not Implemented |
DL0173 # 06 Y:2017 | 06 | 2017 | UPGRADE OBSOLETE EQUIPMENT | $17,600 | $5,950 | Implemented |
DL0173 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,364 | $654 | Not Implemented |