IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3674 Semiconductors And Related Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0217 # 13 Y:2023 13 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,390 $11,744 Not Implemented
DL0217 # 12 Y:2023 12 2023 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,950 $25,000 Not Implemented
DL0217 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,318 $4,100 Implemented
DL0217 # 10 Y:2023 10 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,110 $5,000 Not Implemented
DL0217 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,708 $15,000 Not Implemented
DL0217 # 08 Y:2023 08 2023 REDUCE VENTILATION AIR $1,715 $750 Implemented
DL0217 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,180 $0 Implemented
DL0217 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,621 $0 Implemented
DL0217 # 03 Y:2023 03 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $112,250 $0 Not Implemented
DL0217 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,120 $0 Implemented
DL0217 # 05 Y:2023 05 2023 REDUCE VENTILATION AIR $29,580 $0 Implemented
DL0217 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30,600 $0 Implemented
DL0217 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $2,650 $0 Implemented
DL0173 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,435 $15,000 Implemented
DL0173 # 06 Y:2017 06 2017 UPGRADE OBSOLETE EQUIPMENT $17,600 $5,950 Implemented
DL0173 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,364 $654 Not Implemented
DL0173 # 04 Y:2017 04 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,676 $1,375 Implemented
DL0173 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,100 $9,375 Not Implemented
DL0173 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $20,880 $0 Implemented
DL0173 # 07 Y:2017 07 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,800 $3,940 Not Implemented
WV0344 # 14 Y:2006 14 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $217 $100 Not Implemented
WV0344 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,197 $1,811 Implemented
WV0344 # 12 Y:2006 12 2006 ISOLATE HOT OR COLD EQUIPMENT $1,256 $1,500 Not Implemented
WV0344 # 11 Y:2006 11 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,355 $436 Implemented
WV0344 # 10 Y:2006 10 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,177 $1,896 Implemented