Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 3674 | Semiconductors And Related Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0433 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0433 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,142 | $7,500 | n/a |
AS0433 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0433 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $34,471 | $30,000 | n/a |
AS0432 # 04 Y:2006 | 04 | 2006 | INSTALL EFFICIENT RECTIFIERS | $540 | $15,000 | n/a |
AS0432 # 03 Y:2006 | 03 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $9,888 | $3,000 | n/a |
AS0432 # 02 Y:2006 | 02 | 2006 | USE SOLAR HEAT TO HEAT WATER | $13,683 | $78,400 | n/a |
AS0432 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,236 | $15,000 | n/a |
LE0240 # 08 Y:2006 | 08 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $192 | $300 | Implemented |
LE0240 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,994 | $500 | Implemented |
LE0240 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,178 | $4,500 | Implemented |
LE0240 # 04 Y:2006 | 04 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,308 | $2,500 | Implemented |
LE0240 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,974 | $2,092 | Implemented |
LE0240 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $74,790 | $800 | Not Implemented |
LE0240 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $265,405 | $500,000 | Implemented |
LE0240 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $331 | $300 | Implemented |
LE0240 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,770 | $139,872 | Not Implemented |
WV0344 # 14 Y:2006 | 14 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $217 | $100 | Not Implemented |
WV0344 # 01 Y:2006 | 01 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $50,956 | $1,472 | Implemented |
WV0344 # 02 Y:2006 | 02 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $41,030 | $1,000 | Implemented |
WV0344 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,895 | $15 | Not Implemented |
WV0344 # 04 Y:2006 | 04 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $22,182 | $27,387 | Implemented |
WV0344 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $18,000 | $32,500 | Implemented |
WV0344 # 06 Y:2006 | 06 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,147 | $26,662 | Implemented |
WV0344 # 07 Y:2006 | 07 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,710 | $44 | Not Implemented |