Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3675 | Electronic Capacitors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0059 # 06 Y:2021 | 06 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $139 | $220 | Not Implemented |
NL0059 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $318 | $1,350 | Not Implemented |
NL0059 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $479 | $500 | Implemented |
NL0059 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $702 | $4,153 | Not Implemented |
NL0059 # 02 Y:2021 | 02 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $8,198 | $50,347 | Not Implemented |
NL0059 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,547 | $51,468 | Implemented |
CO0317 # 03 Y:1994 | 03 | 1994 | INSULATE BARE EQUIPMENT | $1,790 | $520 | Not Implemented |
CO0317 # 09 Y:1994 | 09 | 1994 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $0 | $140 | Implemented |
CO0317 # 08 Y:1994 | 08 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $460 | $150 | Not Implemented |
CO0317 # 07 Y:1994 | 07 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $700 | $300 | Implemented |
CO0317 # 06 Y:1994 | 06 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $880 | $1,340 | Implemented |
CO0317 # 05 Y:1994 | 05 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $2,070 | Implemented |
CO0317 # 04 Y:1994 | 04 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $1,600 | $150 | Implemented |
CO0317 # 02 Y:1994 | 02 | 1994 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,603 | $7,080 | Not Implemented |
CO0317 # 01 Y:1994 | 01 | 1994 | USE TIGHT-FITTING LIDS ON MATERIAL CONTAINERS TO REDUCE VOC EMISSIONS | $6,860 | $720 | Not Implemented |
CO0090 # 01 Y:1987 | 01 | 1987 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $381 | $200 | Implemented |
CO0090 # 10 Y:1987 | 10 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $1,000 | Implemented |
CO0090 # 09 Y:1987 | 09 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $65 | $90 | Implemented |
CO0090 # 08 Y:1987 | 08 | 1987 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,147 | $1,350 | Implemented |
CO0090 # 07 Y:1987 | 07 | 1987 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,133 | $2,000 | Implemented |
CO0090 # 06 Y:1987 | 06 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $375 | $500 | Implemented |
CO0090 # 05 Y:1987 | 05 | 1987 | AIR CONDITION ONLY SPACE NECESSARY | $556 | $100 | Implemented |
CO0090 # 04 Y:1987 | 04 | 1987 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $689 | $1,200 | Implemented |
CO0090 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $528 | $350 | Implemented |
CO0090 # 02 Y:1987 | 02 | 1987 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $73 | $100 | Not Implemented |