IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3677 Electronic Coils And Transformers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0464 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,809 $23,000 Implemented
LE0464 # 03 Y:2018 03 2018 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,836 $28,000 Implemented
LE0464 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $114 $40 Implemented
LE0464 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $214 $40 Implemented
LE0464 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,187 $12,000 Implemented
MI0321 # 09 Y:2017 09 2017 INSULATE BARE EQUIPMENT $1,612 $1,914 Implemented
MI0321 # 02 Y:2017 02 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,816 $7,589 Implemented
MI0321 # 04 Y:2017 04 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,777 $5,492 Not Implemented
MI0321 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,233 $3,600 Implemented
MI0321 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,256 $1,660 Implemented
MI0321 # 01 Y:2017 01 2017 USE OPTIMUM THICKNESS INSULATION $17,954 $21,920 Implemented
MI0321 # 06 Y:2017 06 2017 OPTIMIZE PLANT POWER FACTOR $3,370 $10,745 Not Implemented
MI0321 # 10 Y:2017 10 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $400 Implemented
MI0321 # 08 Y:2017 08 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,121 $1,508 Not Implemented
MI0321 # 05 Y:2017 05 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,988 $6,400 Not Implemented
SD0544 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,529 $41,589 Implemented
SD0544 # 08 Y:2017 08 2017 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,798 $7,832 Implemented
SD0544 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,627 $14,788 Not Implemented
SD0544 # 06 Y:2017 06 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,765 $3,500 Implemented
SD0544 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $3,481 $10,611 Implemented
SD0544 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,835 $26,705 Implemented
SD0544 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,488 $8,800 Implemented
SD0544 # 05 Y:2017 05 2017 ISOLATE HOT OR COLD EQUIPMENT $5,008 $2,160 Not Implemented
DL0149 # 06 Y:2015 06 2015 SHUT OFF PILOTS IN STANDBY EQUIPMENT $870 $50 Implemented
DL0149 # 05 Y:2015 05 2015 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,140 $40 Implemented