Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsSIC | 3677 | Electronic Coils And Transformers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0464 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,809 | $23,000 | Implemented |
LE0464 # 03 Y:2018 | 03 | 2018 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,836 | $28,000 | Implemented |
LE0464 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $114 | $40 | Implemented |
LE0464 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $214 | $40 | Implemented |
LE0464 # 05 Y:2018 | 05 | 2018 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,187 | $12,000 | Implemented |
MI0321 # 09 Y:2017 | 09 | 2017 | INSULATE BARE EQUIPMENT | $1,612 | $1,914 | Implemented |
MI0321 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,816 | $7,589 | Implemented |
MI0321 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,777 | $5,492 | Not Implemented |
MI0321 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,233 | $3,600 | Implemented |
MI0321 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,256 | $1,660 | Implemented |
MI0321 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM THICKNESS INSULATION | $17,954 | $21,920 | Implemented |
MI0321 # 06 Y:2017 | 06 | 2017 | OPTIMIZE PLANT POWER FACTOR | $3,370 | $10,745 | Not Implemented |
MI0321 # 10 Y:2017 | 10 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $766 | $400 | Implemented |
MI0321 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,121 | $1,508 | Not Implemented |
MI0321 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,988 | $6,400 | Not Implemented |
SD0544 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,529 | $41,589 | Implemented |
SD0544 # 08 Y:2017 | 08 | 2017 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $2,798 | $7,832 | Implemented |
SD0544 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,627 | $14,788 | Not Implemented |
SD0544 # 06 Y:2017 | 06 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,765 | $3,500 | Implemented |
SD0544 # 07 Y:2017 | 07 | 2017 | USE PHOTOCELL CONTROLS | $3,481 | $10,611 | Implemented |
SD0544 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,835 | $26,705 | Implemented |
SD0544 # 04 Y:2017 | 04 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,488 | $8,800 | Implemented |
SD0544 # 05 Y:2017 | 05 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $5,008 | $2,160 | Not Implemented |
DL0149 # 06 Y:2015 | 06 | 2015 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $870 | $50 | Implemented |
DL0149 # 05 Y:2015 | 05 | 2015 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,140 | $40 | Implemented |