Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2017 |
Principal Product | Capacitor, Resistor, Coil, Transformer, and Other Inductors |
NAICS | 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3677 - Electronic Coils And Transformers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 198 |
Plant Area (Sq.Ft.) | 77,000 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $535,356 | 5,574,528 | kWh | $0.10 |
Electricity Demand | $190,944 | 14,256 | kW-months/year | $13.39 |
Electricity Fees | $113,865 | - | $ | - |
Natural Gas | $43,746 | 6,945 | MMBtu | $6.30 |
TOTAL ENERGY COSTS | $883,911 | |||
RECOMMENDED SAVINGS* | $72,531 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,896 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $23,627 Cost: $14,788 |
$24,607 | 256,333 | $6,270 | 468 | $(-7,250) | (-1,151) | - | - |
$24,607 256,333 kWh |
$6,270 468 kW-months/year |
$(-7,250) (-1,151) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,529 Cost: $41,589 |
$11,822 | 123,126 | $3,170 | 237 | - | - | $537 | - |
$11,822 123,126 kWh |
$3,170 237 kW-months/year |
- - MMBtu |
$537 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,835 Cost: $26,705 |
$10,120 | 105,417 | $2,715 | 203 | - | - | - | - |
$10,120 105,417 kWh |
$2,715 203 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,488 Cost: $8,800 |
$4,327 | 45,061 | $1,161 | 87 | - | - | - | - |
$4,327 45,061 kWh |
$1,161 87 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT |
Savings: $5,008 Cost: $2,160 |
$3,949 | 41,137 | $1,059 | 79 | - | - | - | - |
$3,949 41,137 kWh |
$1,059 79 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $3,765 Cost: $3,500 |
$2,956 | 30,793 | $809 | 60 | - | - | - | - |
$2,956 30,793 kWh |
$809 60 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $3,481 Cost: $10,611 |
$3,342 | 34,824 | $139 | 10 | - | - | - | - |
$3,342 34,824 kWh |
$139 10 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION |
Savings: $2,798 Cost: $7,832 |
$2,206 | 22,984 | $592 | 44 | - | - | - | - |
$2,206 22,984 kWh |
$592 44 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $72,531 Cost: $115,985 |
$63,329 | 659,675 | $15,915 | 1,189 | $(-7,250) | (-1,151) | $537 | - | $63,329 659,675 kWh |
$15,915 1,189 kW-months/year |
$(-7,250) (-1,151) MMBtu |
$537 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,896 Cost: $99,037 |
$34,773 | 362,205 | $8,586 | 641 | - | - | $537 | - | $34,773 362,205 kWh |
$8,586 641 kW-months/year |
- - MMBtu |
$537 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |