Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: SD0544
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: SD0544
Due to University and State restrictions, IAC assessment activities at your local center may be on hold.
Contact your local center for more details on operating status and available services.

Click here for details about Coronavirus (COVID-19) Recovery Support programs
IAC Center San Diego State University
Assessment Year 2017
Principal Product Capacitor, Resistor, Coil, Transformer, and Other Inductors
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677 - Electronic Coils And Transformers
Sales $21,000,000
# of Employees 198
Plant Area (Sq.Ft.) 77,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $535,356 5,574,528 kWh $0.10
Electricity Demand $190,944 14,256 kW-months/year $13.39
Electricity Fees $113,865 - $ -
Natural Gas $43,746 6,945 MMBtu $6.30
TOTAL ENERGY COSTS $883,911
RECOMMENDED SAVINGS* $72,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,896
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$23,627
Cost:
$14,788
$24,607 256,333 $6,270 468 $(-7,250) (-1,151) - - $24,607
256,333
kWh
$6,270
468
kW-months/year
$(-7,250)
(-1,151)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,529
Cost:
$41,589
$11,822 123,126 $3,170 237 - - $537 - $11,822
123,126
kWh
$3,170
237
kW-months/year
-
-
MMBtu
$537
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,835
Cost:
$26,705
$10,120 105,417 $2,715 203 - - - - $10,120
105,417
kWh
$2,715
203
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,488
Cost:
$8,800
$4,327 45,061 $1,161 87 - - - - $4,327
45,061
kWh
$1,161
87
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$5,008
Cost:
$2,160
$3,949 41,137 $1,059 79 - - - - $3,949
41,137
kWh
$1,059
79
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,765
Cost:
$3,500
$2,956 30,793 $809 60 - - - - $2,956
30,793
kWh
$809
60
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,481
Cost:
$10,611
$3,342 34,824 $139 10 - - - - $3,342
34,824
kWh
$139
10
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION Savings:
$2,798
Cost:
$7,832
$2,206 22,984 $592 44 - - - - $2,206
22,984
kWh
$592
44
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$72,531
Cost:
$115,985
$63,329 659,675 $15,915 1,189 $(-7,250) (-1,151) $537 - $63,329
659,675
kWh
$15,915
1,189
kW-months/year
$(-7,250)
(-1,151)
MMBtu
$537
-
$
TOTAL IMPLEMENTED Savings:
$43,896
Cost:
$99,037
$34,773 362,205 $8,586 641 - - $537 - $34,773
362,205
kWh
$8,586
641
kW-months/year
-
-
MMBtu
$537
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes