Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsSIC | 3677 | Electronic Coils And Transformers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0174 # 05 Y:1997 | 05 | 1997 | CONVERT TO LESS TOXIC HYDROCARBON CLEANERS | $4,145 | $0 | Implemented |
SD0174 # 06 Y:1997 | 06 | 1997 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $2,397 | $320 | Not Implemented |
RU0126 # 01 Y:1991 | 01 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,500 | $717 | Implemented |
RU0126 # 02 Y:1991 | 02 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,503 | $0 | Implemented |
RU0126 # 03 Y:1991 | 03 | 1991 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,998 | $5,000 | Implemented |
RU0126 # 04 Y:1991 | 04 | 1991 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,736 | $3,372 | Implemented |
RU0126 # 05 Y:1991 | 05 | 1991 | ISOLATE HOT OR COLD EQUIPMENT | $2,183 | $3,500 | Implemented |
MA0137 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,229 | $3,020 | Not Implemented |
MA0137 # 02 Y:1988 | 02 | 1988 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $588 | $200 | Not Implemented |
MA0137 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118 | $56 | Not Implemented |
KU0220 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,362 | $3,200 | Implemented |
KU0220 # 02 Y:1987 | 02 | 1987 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,475 | $600 | Not Implemented |
KU0220 # 03 Y:1987 | 03 | 1987 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $280 | $0 | Implemented |
KU0220 # 04 Y:1987 | 04 | 1987 | COVER OPEN TANKS | $756 | $70 | Not Implemented |
KU0220 # 05 Y:1987 | 05 | 1987 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $113 | $10 | Implemented |
KU0179 # 01 Y:1985 | 01 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,642 | $500 | Implemented |
KU0179 # 02 Y:1985 | 02 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,693 | $764 | Not Implemented |
KU0179 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $1,450 | Implemented |
KU0179 # 04 Y:1985 | 04 | 1985 | USE OPTIMUM THICKNESS INSULATION | $730 | $1,138 | Not Implemented |
KU0179 # 05 Y:1985 | 05 | 1985 | COVER OPEN TANKS | $279 | $60 | Implemented |
KU0179 # 06 Y:1985 | 06 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $174 | $0 | Implemented |
TN0154 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $844 | $25 | Not Implemented |
TN0154 # 02 Y:1982 | 02 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,418 | $3,500 | Not Implemented |
TN0154 # 03 Y:1982 | 03 | 1982 | INSTALL SET-BACK TIMERS | $642 | $2,100 | Not Implemented |
TN0154 # 04 Y:1982 | 04 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $264 | $0 | Not Implemented |