IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 3677 Electronic Coils And Transformers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0174 # 05 Y:1997 05 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $4,145 $0 Implemented
SD0174 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $2,397 $320 Not Implemented
RU0126 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $717 Implemented
RU0126 # 02 Y:1991 02 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,503 $0 Implemented
RU0126 # 03 Y:1991 03 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,998 $5,000 Implemented
RU0126 # 04 Y:1991 04 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,736 $3,372 Implemented
RU0126 # 05 Y:1991 05 1991 ISOLATE HOT OR COLD EQUIPMENT $2,183 $3,500 Implemented
MA0137 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,229 $3,020 Not Implemented
MA0137 # 02 Y:1988 02 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $588 $200 Not Implemented
MA0137 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $56 Not Implemented
KU0220 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,362 $3,200 Implemented
KU0220 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,475 $600 Not Implemented
KU0220 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $0 Implemented
KU0220 # 04 Y:1987 04 1987 COVER OPEN TANKS $756 $70 Not Implemented
KU0220 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $113 $10 Implemented
KU0179 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,642 $500 Implemented
KU0179 # 02 Y:1985 02 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,693 $764 Not Implemented
KU0179 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,450 Implemented
KU0179 # 04 Y:1985 04 1985 USE OPTIMUM THICKNESS INSULATION $730 $1,138 Not Implemented
KU0179 # 05 Y:1985 05 1985 COVER OPEN TANKS $279 $60 Implemented
KU0179 # 06 Y:1985 06 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $174 $0 Implemented
TN0154 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $25 Not Implemented
TN0154 # 02 Y:1982 02 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,418 $3,500 Not Implemented
TN0154 # 03 Y:1982 03 1982 INSTALL SET-BACK TIMERS $642 $2,100 Not Implemented
TN0154 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $0 Not Implemented