Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 3678 | Electronic Connectors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0656 # 01 Y:2024 | 01 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,203 | $18,032 | n/a |
SD0656 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,836 | $74,485 | n/a |
SD0656 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $54,943 | $3,087 | n/a |
SD0656 # 04 Y:2024 | 04 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $54,151 | $15,130 | n/a |
SD0656 # 05 Y:2024 | 05 | 2024 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $2,144 | $2,200 | n/a |
SD0656 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,164 | $2,109 | n/a |
SD0656 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,422 | $2,040 | n/a |
SD0656 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,188 | $500 | n/a |
SD0656 # 09 Y:2024 | 09 | 2024 | PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) | $35,678 | $51,900 | n/a |
SD0656 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,299 | $3,896 | n/a |
SD0656 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,784 | $2,109 | n/a |
SD0656 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,042 | $11,447 | n/a |
SF0397 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,301 | $9,456 | Not Implemented |
SF0397 # 10 Y:2011 | 10 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $28,839 | $152,713 | Not Implemented |
SF0397 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,066 | $2,420 | Implemented |
SF0397 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,920 | $6,639 | Not Implemented |
SF0397 # 07 Y:2011 | 07 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,428 | $6,271 | Implemented |
SF0397 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $3,294 | $7,163 | Implemented |
SF0397 # 09 Y:2011 | 09 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $19,656 | $79,881 | Implemented |
SF0397 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,482 | $1,759 | Not Implemented |
SF0397 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,394 | $0 | Implemented |
SF0397 # 01 Y:2011 | 01 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,161 | $0 | Implemented |
SD0099 # 04 Y:1994 | 04 | 1994 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $58,207 | $132,600 | Not Implemented |
SD0099 # 03 Y:1994 | 03 | 1994 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $47,221 | $10,000 | Not Implemented |
SD0099 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,013 | $50,500 | Not Implemented |