IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
SIC 3678 Electronic Connectors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $28,013 $50,500 Not Implemented
SD0099 # 03 Y:1994 03 1994 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $47,221 $10,000 Not Implemented
SD0099 # 04 Y:1994 04 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $58,207 $132,600 Not Implemented
MO0069 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,525 $29,000 Implemented
MO0069 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,501 $450 Implemented
MO0069 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,641 $5,145 Not Implemented
MO0069 # 04 Y:1992 04 1992 IMPROVE LUBRICATION PRACTICES $4,967 $587 Not Implemented
MO0069 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,541 $1,300 Implemented
MO0069 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,853 $760 Implemented
MO0069 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $894 $3,500 Implemented
AS0049 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,582 $57,505 Implemented
AS0049 # 02 Y:1992 02 1992 KEEP LAMPS AND REFLECTORS CLEAN $41,506 $83,545 Implemented
AS0049 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $890 $1,500 Implemented
AS0049 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $454 $700 Implemented
AS0049 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $3,390 Implemented
AS0049 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,522 $0 Implemented
AS0049 # 07 Y:1992 07 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,767 $69,018 Not Implemented
AS0049 # 08 Y:1992 08 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,191 $5,600 Not Implemented
AS0049 # 09 Y:1992 09 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,248 $500 Implemented
AS0049 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,233 $100 Implemented
AS0049 # 11 Y:1992 11 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,340 $50,250 Not Implemented
KU0160 # 01 Y:1985 01 1985 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,445 $10,000 Implemented
KU0160 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,982 $900 Implemented
KU0160 # 03 Y:1985 03 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,662 $2,000 Implemented
KU0160 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $371 $192 Not Implemented