IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3678 Electronic Connectors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0465 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,608 $3,900 Not Implemented
AS0465 # 04 Y:2019 04 2019 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,850 $17,634 Implemented
AS0465 # 03 Y:2019 03 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $41,936 $1,100 Not Implemented
AS0465 # 02 Y:2019 02 2019 UPGRADE CONTROLS ON COMPRESSORS $56,756 $18,258 Not Implemented
AS0465 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,350 $43,576 Not Implemented
AS0465 # 06 Y:2019 06 2019 RECOVER MECHANICAL ENERGY $4,582 $20,880 Not Implemented
AS0286 # 03 Y:2000 03 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,073 $6,959 Not Implemented
AS0286 # 10 Y:2000 10 2000 $567 $120 Not Implemented
AS0286 # 09 Y:2000 09 2000 $5,355 $1,500 Not Implemented
AS0286 # 08 Y:2000 08 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,509 $780 Not Implemented
AS0286 # 07 Y:2000 07 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $576 $60 Not Implemented
AS0286 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,244 $120 Not Implemented
AS0286 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,262 $120 Not Implemented
AS0286 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $407 $609 Not Implemented
AS0286 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,469 $3,800 Not Implemented
AS0286 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,045 $382 Not Implemented
AS0049 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,582 $57,505 Implemented
AS0049 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,233 $100 Implemented
AS0049 # 09 Y:1992 09 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,248 $500 Implemented
AS0049 # 08 Y:1992 08 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $2,191 $5,600 Not Implemented
AS0049 # 07 Y:1992 07 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,767 $69,018 Not Implemented
AS0049 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,522 $0 Implemented
AS0049 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $491 $3,390 Implemented
AS0049 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $454 $700 Implemented
AS0049 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $890 $1,500 Implemented