Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3678 Electronic Connectors
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0656 # 01 Y:2024 01 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,203 $18,032 n/a
SD0656 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,836 $74,485 n/a
SD0656 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $54,943 $3,087 n/a
SD0656 # 04 Y:2024 04 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $54,151 $15,130 n/a
SD0656 # 05 Y:2024 05 2024 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,144 $2,200 n/a
SD0656 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,164 $2,109 n/a
SD0656 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,422 $2,040 n/a
SD0656 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,188 $500 n/a
SD0656 # 09 Y:2024 09 2024 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $35,678 $51,900 n/a
SD0656 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,299 $3,896 n/a
SD0656 # 11 Y:2024 11 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,784 $2,109 n/a
SD0656 # 12 Y:2024 12 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,042 $11,447 n/a
SF0397 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,301 $9,456 Not Implemented
SF0397 # 10 Y:2011 10 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,839 $152,713 Not Implemented
SF0397 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,066 $2,420 Implemented
SF0397 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $6,639 Not Implemented
SF0397 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,428 $6,271 Implemented
SF0397 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,294 $7,163 Implemented
SF0397 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,656 $79,881 Implemented
SF0397 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,482 $1,759 Not Implemented
SF0397 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,394 $0 Implemented
SF0397 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,161 $0 Implemented
SD0099 # 04 Y:1994 04 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $58,207 $132,600 Not Implemented
SD0099 # 03 Y:1994 03 1994 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $47,221 $10,000 Not Implemented
SD0099 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $28,013 $50,500 Not Implemented