Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,145
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0033 # 07 Y:2025 | 07 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $39,875 | $0 | n/a |
SJ0033 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,035 | $0 | n/a |
SJ0033 # 08 Y:2025 | 08 | 2025 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $57,302 | $150,000 | n/a |
SJ0033 # 06 Y:2025 | 06 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,984 | $316 | n/a |
SJ0033 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,071 | $384 | n/a |
SJ0033 # 10 Y:2025 | 10 | 2025 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $88,611 | $0 | n/a |
SJ0033 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,132 | $39,246 | n/a |
SJ0033 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,902 | $507,150 | n/a |
SJ0033 # 09 Y:2025 | 09 | 2025 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,191 | $0 | n/a |
SJ0033 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $0 | n/a |
UU0262 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,117 | $834 | n/a |
UU0262 # 04 Y:2025 | 04 | 2025 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $13,561 | $178,488 | n/a |
UU0262 # 02 Y:2025 | 02 | 2025 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $14,276 | $180,000 | n/a |
UU0262 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $5,129 | $12,300 | n/a |
UU0262 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $762 | $2,640 | n/a |
UU0262 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $24,314 | $29,878 | n/a |
UU0262 # 06 Y:2025 | 06 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $720 | $1,680 | n/a |
UU0262 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $12,361 | $217,800 | n/a |
MI0451 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,862 | $16,333 | n/a |
MI0451 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $529 | $949 | n/a |
MI0451 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,582 | $40 | n/a |
MI0451 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,130 | $4,044 | n/a |
MI0451 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,513 | $1,755 | n/a |
MI0451 # 03 Y:2024 | 03 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,251 | $10,833 | n/a |
MI0451 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,231 | $100 | n/a |