Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,083
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 06 Y:2023 | 06 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $53,597 | $0 | Not Implemented |
SD0637 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $788 | $1,660 | Not Implemented |
SD0637 # 04 Y:2023 | 04 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,593 | $8,642 | Not Implemented |
SD0637 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,827 | $115,927 | Not Implemented |
SD0637 # 10 Y:2023 | 10 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $25,625 | $49,475 | Not Implemented |
NT0007 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,290 | $5,486 | Not Implemented |
NT0007 # 03 Y:2023 | 03 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,470 | $0 | Not Implemented |
NT0007 # 05 Y:2023 | 05 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,000 | $7,500 | Not Implemented |
NT0007 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $63,856 | $337,512 | Not Implemented |
NT0007 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,184 | $5,993 | Implemented |
WM0201 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,042 | $195 | Not Implemented |
WM0201 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,077 | $1,814 | Not Implemented |
WM0201 # 03 Y:2023 | 03 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,633 | $7,520 | Not Implemented |
WM0201 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,589 | $2,500 | Not Implemented |
WM0201 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,913 | $15,200 | Not Implemented |
WM0199 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,125 | $1,662 | Not Implemented |
WM0199 # 04 Y:2023 | 04 | 2023 | USE COMPRESSOR AIR FILTERS | $1,447 | $2,189 | Implemented |
WM0199 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,889 | $2,175 | Not Implemented |
WM0199 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,795 | $44,389 | Implemented |
WM0199 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,348 | $0 | Not Implemented |
CI0007 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $4,072 | $15,610 | n/a |
CI0007 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,887 | $50 | n/a |
CI0007 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,123 | $836 | n/a |
CI0007 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,880 | $300 | n/a |