Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1050 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,940 | $32,403 | Implemented |
UD1050 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,060 | $0 | Not Implemented |
UD1050 # 05 Y:2023 | 05 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,168 | $0 | Not Implemented |
UD1050 # 02 Y:2023 | 02 | 2023 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $3,723 | $0 | Not Implemented |
UD1050 # 01 Y:2023 | 01 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,383 | $0 | Implemented |
UD1050 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,863 | $0 | Implemented |
UD0779 # 04 Y:2008 | 04 | 2008 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $13,555 | $500 | Implemented |
UD0779 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,658 | $1,000 | Implemented |
UD0779 # 11 Y:2008 | 11 | 2008 | PAY BILLS ON TIME TO AVOID LATE FEES | $4,322 | $0 | Implemented |
UD0779 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,499 | $9,173 | Not Implemented |
UD0779 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $5,482 | $3,000 | Not Implemented |
UD0779 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $8,895 | $412 | Implemented |
UD0779 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,679 | $35,000 | Not Implemented |
UD0779 # 06 Y:2008 | 06 | 2008 | IMPROVE COMBUSTION CONTROL CAPABILITY | $75,942 | $100,000 | Implemented |
UD0779 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $95,648 | $1,000 | Implemented |
UD0779 # 01 Y:2008 | 01 | 2008 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $255,168 | $200,000 | Not Implemented |
UD0779 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,503 | $3,318 | Implemented |
UD0779 # 03 Y:2008 | 03 | 2008 | REPLACE BOILER | $17,736 | $65,000 | Implemented |
UD0779 # 14 Y:2008 | 14 | 2008 | COVER OPEN TANKS | $537 | $360 | Implemented |
UD0779 # 13 Y:2008 | 13 | 2008 | INSULATE BARE EQUIPMENT | $1,228 | $100 | Implemented |
UD0779 # 15 Y:2008 | 15 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $481 | $2,000 | Not Implemented |
UD0624 # 04 Y:2001 | 04 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $281 | $500 | Not Implemented |
UD0624 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $980 | $414 | Implemented |
UD0624 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,975 | $13,704 | Implemented |
UD0624 # 01 Y:2001 | 01 | 2001 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $29,813 | $10,710 | Not Implemented |