Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0031 # 02 Y:1992 | 02 | 1992 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $67 | $115 | Not Implemented |
SD0031 # 01 Y:1992 | 01 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,075 | $6,000 | Not Implemented |
WI0151 # 08 Y:1992 | 08 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $801 | $0 | Not Implemented |
WI0151 # 07 Y:1992 | 07 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $938 | $0 | Implemented |
WI0151 # 06 Y:1992 | 06 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,571 | $2,100 | Implemented |
WI0151 # 05 Y:1992 | 05 | 1992 | INSTALL SET-BACK TIMERS | $311 | $400 | Not Implemented |
WI0151 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $134 | $9 | Implemented |
WI0151 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,055 | $0 | Not Implemented |
WI0151 # 02 Y:1992 | 02 | 1992 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $783 | $0 | Not Implemented |
WI0151 # 01 Y:1992 | 01 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $4,528 | $200 | Not Implemented |
MO0053 # 02 Y:1992 | 02 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,312 | $0 | Not Implemented |
MO0053 # 01 Y:1992 | 01 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $47,665 | $29,000 | Implemented |
MO0053 # 03 Y:1992 | 03 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $959 | $0 | Not Implemented |
MO0053 # 04 Y:1992 | 04 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,537 | $958 | Not Implemented |
MO0053 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,972 | $5,350 | Implemented |
MO0053 # 06 Y:1992 | 06 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,845 | $0 | Not Implemented |
MO0053 # 07 Y:1992 | 07 | 1992 | INSULATE BARE EQUIPMENT | $29,176 | $3,956 | Not Implemented |
MO0053 # 08 Y:1992 | 08 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,123 | $3,321 | Not Implemented |
MO0053 # 09 Y:1992 | 09 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,499 | $50 | Not Implemented |
SD0011 # 01 Y:1992 | 01 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,313 | $1,095 | Not Implemented |
SD0011 # 03 Y:1992 | 03 | 1992 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,086 | $2,300 | Not Implemented |
SD0011 # 02 Y:1992 | 02 | 1992 | INSULATE BARE EQUIPMENT | $138 | $190 | Not Implemented |
SD0011 # 09 Y:1992 | 09 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $70 | $562 | Implemented |
SD0011 # 08 Y:1992 | 08 | 1992 | KEEP LAMPS AND REFLECTORS CLEAN | $37,022 | $58,440 | Not Implemented |
SD0011 # 07 Y:1992 | 07 | 1992 | INSTALL SET-BACK TIMERS | $8,496 | $7,950 | Not Implemented |